Behind the scenes · 05-working-docs + 05-scope
internal scaffoldingThis phase produces working files, not a single customer-facing document. Listed below are the files ProposalGen authored. They feed into the polished steps before and after this one.
05-working-docs/
23 files- A1-io-list-AUDIT.xlsxOpen
- A1-io-list.yamlOpen
- A2-equipment-takeoff-AUDIT.xlsxOpen
- A2-equipment-takeoff.yamlOpen
- A3-cable-schedule-AUDIT.xlsxOpen
- A3-cable-schedule.yamlOpen
- A4-panel-schedule-AUDIT.xlsxOpen
- A4-panel-schedule.yamlOpen
- A5-network-architecture.mdOpen
- A5-network.pngOpen
- A6-head-end-equipment.yamlOpen
- A7-power-provisions.yamlOpen
- B1-programming-objects.yamlOpen
- B2-graphics-pages.yamlOpen
- B3-commissioning-points.yamlOpen
- B4-installation-manhours.yamlOpen
- C1-co-matrix.mdOpen
- C2-coordination-matrix.mdOpen
- C3-inclusions-exclusions.mdOpen
- D1-gantt.pngOpen
- D1-schedule.mdOpen
- D2-manpower-loading.mdOpen
- D3-risk-register.mdOpen
05-scope/
12 files- 1.x--bms-project-management-engineering.mdOpen
- 2.1--bms-head-end.mdOpen
- 2.2--bms-network-infrastructure.mdOpen
- 2.3--bms-controller-panel.mdOpen
- 2.3+3.4--controller-panel.mdOpen
- 2.4--bms-field-devices-hvac.mdOpen
- 2.5--bms-field-devices-plumbing.mdOpen
- 2.6--bms-field-devices-power.mdOpen
- 2.7--bms-cabling-and-containment.mdOpen
- 4.x--bms-programming-engineering.mdOpen
- 5.x--bms-testing-commissioning.mdOpen
- 6.x--bms-training-handover.mdOpen