# A7 — Power Provisions Schedule
# Source: A4 panel schedule + assumption A-002 + Mario A. Alix EE-CB#8 (LV scheme)
# Date: 2026-04-28

metadata:
  project: "Kingsford Hotel Bacolod — BMS Rehabilitation (A/B run)"
  date: 2026-04-28
  status: draft v1

panels:
  - id: MCP-PLANT
    location: "2nd Floor — Plant Room"
    feed: "240 V 1-Φ from Plant Room MDP, dedicated 20 A breaker"
    estimated_load_w: 250
    ups_backed: true
    notes: "BMS server + core switch + firewall + 1× edge switch + plant controllers"
    by: EE Contractor (BMS provides termination spec)

  - id: FCP-RD
    location: "Roofdeck"
    feed: "240 V 1-Φ from Roofdeck DPB, dedicated 16 A breaker"
    estimated_load_w: 110
    ups_backed: true (local 0.6 kVA UPS)
    notes: "Cooling tower controllers, DOAS-RD, PAHU-RD, calorifier-HZ"
    by: EE Contractor

  - id: FCP-3F
    location: "3rd Floor — Amenity"
    feed: "240 V 1-Φ from 3F DPB"
    estimated_load_w: 65
    ups_backed: true (local 0.6 kVA UPS)
    notes: "27 exhaust fan I/O concentrator + amenity AHU"
    by: EE Contractor

  - id: FCP-2F
    location: "2nd Floor — BOH/Casino"
    feed: "240 V 1-Φ from 2F BOH DPB"
    estimated_load_w: 95
    ups_backed: true
    notes: "AHUs (B.1..3, PF, EL, FR2, FR3, 2M.1, 2M.2), DOAS-2M, ionizers"
    by: EE Contractor

  - id: FCP-GF
    location: "Ground Floor — BOH"
    feed: "240 V 1-Φ from GF BOH DPB"
    estimated_load_w: 60
    ups_backed: true
    notes: "AHUs 1.1/1.2/1.3, GF exhaust fans"
    by: EE Contractor

  - id: FCP-BSMT
    location: "Basement / Lower Ground"
    feed: "240 V 1-Φ from Basement DPB"
    estimated_load_w: 70
    ups_backed: true
    notes: "Boilers, calorifier-LZ, generator/ATS dry contacts"
    by: EE Contractor

field_panels:
  total_panel_load_w: 650
  panel_count: 6

head_end:
  total_head_end_load_w: 600
  ups_protected: true

network_edge:
  total_edge_load_w: 250
  edge_count: 5

summary:
  total_bms_load_w: 1500

network_nodes:
  total_estimated_load_w: 650
  ups_design_basis: "Each panel's local UPS sized for 30 min ride-through at 1.5× steady state."
  power_quality_requirement: "TVSS at panel feed, ground reference at the BMS rack only."

power_metering_points:
  meters_in_scope:
    - PM-MAIN (incomer transformer main)
    - PM-GEN (genset incomer)
    - PM-MCC-CHILLER (chiller MCC feeder)
    - PM-MCC-CT (cooling tower MCC feeder)
    - PM-MCC-BOILER (boiler MCC feeder)
    - PM-MCC-FIRE-PUMP (fire pump MCC feeder)
    - PM-MCC-MDP-1 / -2 / -3 (major MDP feeders)
  protocol: Modbus RTU daisy-chain to MCP-PLANT BACnet/Modbus gateway
  source: A-002

coordination_with_EE:
  - "EE-CB#8 confirmed revised power scheme. BMS provides termination spec to EE Contractor for each panel feed."
  - "EE Contractor provides 240V breaker, dedicated circuit, surge suppression at the panel feed."
  - "BMS Contractor provides internal power distribution within the BMS panel (DIN-rail breakers, terminal blocks)."