Proposal walkthrough
SMC MRT FDASACS Integration
12 customer inputs · 12 steps · 12 deliverables.
Step 1 · Inputs
Customer documents
What ProposalGen started with.
- Open
ANNEX_A-Depot-Electronics-Network.pdf
- Open
ANNEX_B-Overall-Network-Architecture.pdf
- Open
ANNEX_C1-Electronics-Spec-Depot.pdf
- Open
ANNEX_C2-Electronics-Spec-Stations.pdf
- Open
ANNEX_D1-FACP-Notifier-NFS2-3030-DVC.pdf
- Open
ANNEX_D2-ACS-Suprema-CS40.pdf
- Open
Depot FDAS and ACS Electronics Networks-Pre-bid Presmat- for BPG Supplier 4.21.26.pdf
- Open
Email_Text.rtf
- Open
MRT7 Depot Overall Ductbank and Manhole Monitoring_4.23.26.pdf
- Open
MRT7 INTEGRATION BOQ.xlsx
- Open
Section 01 - Guidelines in Electrical & Electronic Equipment Brand Selection.pdf
- Open
TOR-rev3-2026-03-16.pdf
Step 2 · Process
Steps Taken by ProposalGen
ProposalGen has finished — review what it did, step by step.
Step 3 · Outputs
Deliverable documents
What ProposalGen produced.
- 1.1 MBOpen
Final proposal
10-proposal-final.pdf
- 8 KBOpen
00-team-review-pack.md
- 6 KBOpen
01-compliance-matrix.md
- 5 KBOpen
02-schedule-summary.md
- 4 KBOpen
03-cover-letter.md
- 16 KBOpen
04-technical-proposal.md
- 4 KBOpen
05-commercial-proposal.md
- 74 KBOpen
06-DUPA-workbook.xlsx
- 4 KBOpen
06-boq-excel.csv
- 8 KBOpen
07-final-assembly-checklist.md
- 13 KBOpen
08-equipment-pm-schedule.md
- 6 KBOpen
09-accredited-suppliers.md
Review history
Reviewer feedback & version cycles
Each cycle bundles open feedback into one ProposalGen pass and the version it produces. Cycles appear here once the team triggers a pass.
Closed cycles
No review cycles yet. A cycle bundles a batch of feedback into one ProposalGen pass and the version it produces — it'll show up here once ProposalGen processes the first batch.
Open feedback
Comments not yet processed by ProposalGen
Posted from any step in the walkthrough. Most recent first.
No open feedback. Comments left in the Team notes drawer of any step show up here.