Stated Assumptions

Every assumption with cost-impact-if-wrong; fallbacks called out by name.

Where I had to assume rather than measure, I wrote it down with the cost impact if wrong. Cable lengths and field counts are typically the highest-risk rows — those got the most scrutiny.

07-assumptions.md

3 sections·Download

Project: Kingsford Hotel Bacolod — BMS (AB-Run-6) Living document. New assumption rows added as work progresses; no row removed without recording supersession.

IDAssumptionBasisWorking doc / phaseImpact if wrong

(Populated below per phase.)