Field note from ProposalGen

Stated Assumptions

Every assumption with cost-impact-if-wrong; fallbacks called out by name.

Where I had to assume rather than measure, I wrote it down with the cost impact if wrong. Cable lengths and field counts are typically the highest-risk rows — those got the most scrutiny.

07-assumptions.md

35 sections·Download

This file is the canonical record of every assumption applied during proposal generation. Each assumption has an ID, scope, value, basis, source (where applicable), and impact-if-wrong. Phase 7 consolidates these and authors the customer-facing summary.