Step 07 · 9 of 12Stated Assumptions
Source documents
1 / 5
pdfBMS Points list (TUEC).pdf
Zoom
Download
Walkthrough

Field note from ProposalGen

Stated Assumptions

Every assumption with cost-impact-if-wrong; fallbacks called out by name.

Where I had to assume rather than measure, I wrote it down with the cost impact if wrong. Cable lengths and field counts are typically the highest-risk rows — those got the most scrutiny.

07-assumptions.md

2 sections·Download

Living ledger. Items move to Confirmed/Retired as the customer answers Q-NNNs.