Field note from ProposalGen

Open Items / RFI

Questions for the customer; each frames what the answer would change.

I framed each open question with what we assumed and what an answer would change. The intent is to make 'what we don't know' as legible as 'what we do.'

08-customer-clarifications.md

Download

08 — Customer Clarifications (RFI list)

Project: Kingsford Hotel Bacolod — BMS Status: living document — populated through phases.

IDQuestionAffectsCurrent assumptionPriority
Q-001Confirm scope intent — cover letter says "Rehabilitation" but technical inputs (CB#8, BMS Construction Bulletin Oct 2025) read as new construction. Is the BMS scope greenfield or rehab?Phase 2 classification + entire pricing basisA-001 (greenfield)High
Q-002Is there a BMS-04 sheet (or beyond) for hot-water-distribution / guest-floor in-unit BMS that hasn't been issued? Or is BMS-01/02/03 the complete project set?A1 I/O list, A2 takeoffA-006High
Q-003Is Casino BMS (BMS-02) included in BMS Contractor scope, or contracted separately by Casino tenant/operator?Scope, BOQ, commercialsA-016 (included)High
Q-005Architectural floor plans — especially guestroom floors (4F and above) — please provide. Or confirm guestroom floor count & typical floorplate.A2, A3A-002 (~10 guest floors, ~60 × 50 m)High
Q-006Mechanical (HVAC duct/pipe) and Plumbing layout drawings — to confirm equipment counts per zone.A2A-003 (typical density × points-list zones)Medium
Q-007Full Electrical drawing set — only CB#8 revisions provided. Please send latest issued EE set including main one-line diagram.A7 + cross-checkA-004 (consistent)Medium
Q-008EE-24 Part 2 of 2 (upper-floor riser) — please provide.A3 (riser cables 4F+)A-005 (typical hotel riser)Medium
Q-009Confirm BMS-panel power-feed assignments in EE schedule — no BMS feeders named on EE-21/22/23.A7A-007 (1× 20 A, 230 V, 1-phase per panel)Medium
Q-011Head-end / server room location — please confirm intended siting (Basement 1 control room, GF, or other).A5, A6A-013 (central control room TBD)Medium
Q-012Is Fire-Alarm / Security / Access / IT integration part of BMS Contractor scope?Scope, exclusionsA-017 (excluded — BMS-only with optional Modbus power-meter HLI)Medium
Q-013Project schedule — required completion / substantial-completion date and any milestone constraints (e.g., chiller-room ready-for-T&C date).D1, D2, B4A-014 (8-month BMS scope)High
Q-014Commercial terms — warranty period, payment milestone schedule, retention %, LDs, tax handling, currency.10-proposal commercial sectionA-015 (industry-standard defaults)High
Q-015Currency confirmation — proposal in PHP unless otherwise advised.PricingA-015 (PHP)Low
Q-016Training — confirm scope (operator + admin + super-user, batch size, duration).Training moduleA-010 (2-day operator + 1-day admin)Low
Q-017M&O after handover — required as base scope or priced option?ScopeA-011 (priced option)Low
Q-018Customer GUI / graphics standard — does Megaworld have a specific GUI mock-up or branding guideline?B2 graphicsA-008 (per BMS-01 spec)Low
Q-019FAT / SAT protocol — does Megaworld have a standard form?T&C scopeA-009 (industry standard)Low
Q-020Power-meter integration — confirm which EE meters/sub-meters are Modbus-equipped vs. pulse-only.A1 (HLI rows), A7A-018 (Modbus-only HLI; no meter supply)Low
Q-021Containment scope — confirm BMS Contractor supplies all cable tray + conduit for BMS-cabling backbone, or share-with-other-LV trunks where approved.A3, B4, BOQA-019 (BMS Contractor scope; sharing allowed where approved)Low

Why I made these choices

3 decisions