Summary

A2 — Equipment Takeoff, Audit View
ProjectKingsford Hotel Bacolod BMS
Canonical sourceA2-equipment-takeoff.yaml
How to record correctionsEdit the canonical YAML directly — add a verification: block to the affected row(s)
Totals
Total equipment instances135
Equipment classes25
Locations17
Verification status
StatusCount% of total
verified00%
needs_correction00%
uncertain00%
unverified135100%
⚠ Known weak points
Verify quantities and locations against mechanical / electrical drawings. The 'Make/Model' field is a generic class default — supplier RFQ refines.
How corrections flow
Edit A2-equipment-takeoff.yaml — add a verification: block to the affected row when location or count is confirmed/corrected.

By Class

Equipment classCount
Exhaust Fan (General)34
Exhaust Fan (Toilet)34
Multifunction Power Meter (Feeder)10
Heat Pump6
Calorifier (Hot Water Storage Tank)6
Recirculating Pump6
Chiller (Package Water-Cooled)3
AHU (Chilled-Water-Served)3
Condenser Water Pump3
Cooling Tower3
DOAS Unit3
Multifunction Power Meter (Main)3
Primary CHW Pump3
AHU (Modulating CHW-served)2
Condenser Water Header2
Hot Water Header Set2
Ozone Generator (UV-light or Corona)2
Precooled Air Handling Unit2
Steam Boiler2
BTU Meter1
Cooling Tower (Common)1
CHW Bypass Header1
CHW Return Main Header1
CHW Supply Main Header1
Primary CHW Pump (Standby)1
TOTAL135

By Location

LocationCount
3rd Amenity & Guestroom27
Basement16
2nd Floor13
2F/CHW Pump Room11
Roofdeck/HW Plant10
Lower Ground/HW Plant10
Distribution (per A4)10
GF Main Lobby9
Roofdeck/Cooling Tower Area6
2nd Level/Casino MVAC Plant5
GND/Chiller Plant Room3
GND/BOH AHU Area3
Roofdeck3
Main Switchgear Room3
Roofdeck/Hotel DOAS Plant2
Roofdeck/PAHU Plant2
Lower Ground/Boiler Room2

Detail

IDClassLocationPanelPrimary C/OStatusVerified byDateDrawing refNotes
AHU-2M.1AHU (Modulating CHW-served)2nd Level/Casino MVAC PlantPNL-AHU-L2BMS Contractorunverified
AHU-2M.2AHU (Modulating CHW-served)2nd Level/Casino MVAC PlantPNL-AHU-L2BMS Contractorunverified
BTU-CHWS-MAINBTU Meter2F/CHW Pump RoomPNL-CHWP-L2BMS Contractorunverified
CH-1Chiller (Package Water-Cooled)GND/Chiller Plant RoomPNL-CH-PLANT-GNDEquipment Supplierunverified
CH-2Chiller (Package Water-Cooled)GND/Chiller Plant RoomPNL-CH-PLANT-GNDEquipment Supplierunverified
CH-3Chiller (Package Water-Cooled)GND/Chiller Plant RoomPNL-CH-PLANT-GNDEquipment Supplierunverified
CHWP-1.1AHU (Chilled-Water-Served)GND/BOH AHU AreaPNL-CHWP-GNDEquipment Supplierunverified
CHWP-1.2AHU (Chilled-Water-Served)GND/BOH AHU AreaPNL-CHWP-GNDEquipment Supplierunverified
CHWP-1.3AHU (Chilled-Water-Served)GND/BOH AHU AreaPNL-CHWP-GNDEquipment Supplierunverified
COMP-1Condenser Water Pump2F/CHW Pump RoomPNL-CHWP-L2Equipment Supplierunverified
COMP-2Condenser Water Pump2F/CHW Pump RoomPNL-CHWP-L2Equipment Supplierunverified
COMP-3Condenser Water Pump2F/CHW Pump RoomPNL-CHWP-L2Equipment Supplierunverified
CT-1Cooling TowerRoofdeck/Cooling Tower AreaPNL-CT-RDBMS Contractorunverified
CT-2Cooling TowerRoofdeck/Cooling Tower AreaPNL-CT-RDBMS Contractorunverified
CT-3Cooling TowerRoofdeck/Cooling Tower AreaPNL-CT-RDBMS Contractorunverified
CT-COMMONCooling Tower (Common)Roofdeck/Cooling Tower AreaPNL-CT-RDBMS Contractorunverified
DOAS-2WDOAS Unit2nd Level/Casino MVAC PlantPNL-DOAS-L2Equipment Supplierunverified
DOAS-RD.1DOAS UnitRoofdeck/Hotel DOAS PlantPNL-DOAS-RDEquipment Supplierunverified
DOAS-RD.2DOAS UnitRoofdeck/Hotel DOAS PlantPNL-DOAS-RDEquipment Supplierunverified
EF-1 (RD)Exhaust Fan (General)RoofdeckPNL-VENT-RDEquipment Supplierunverified
EF-1.2AExhaust Fan (General)GF Main LobbyPNL-VENT-GFEquipment Supplierunverified
EF-1MR.1Exhaust Fan (General)GF Main LobbyPNL-VENT-GFEquipment Supplierunverified
EF-1ST0.1Exhaust Fan (General)GF Main LobbyPNL-VENT-GFEquipment Supplierunverified
EF-2.1Exhaust Fan (General)2nd FloorPNL-VENT-L2Equipment Supplierunverified
EF-2.2Exhaust Fan (General)2nd FloorPNL-VENT-L2Equipment Supplierunverified
EF-2.3Exhaust Fan (General)2nd FloorPNL-VENT-L2Equipment Supplierunverified
EF-2.4Exhaust Fan (General)2nd FloorPNL-VENT-L2Equipment Supplierunverified
EF-2B.1Exhaust Fan (General)2nd FloorPNL-VENT-L2Equipment Supplierunverified
EF-2B.2Exhaust Fan (General)2nd FloorPNL-VENT-L2Equipment Supplierunverified
EF-3.1Exhaust Fan (General)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
EF-3.2Exhaust Fan (General)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
EF-3SF.2Exhaust Fan (General)BasementPNL-VENT-BSMTEquipment Supplierunverified
EF-8R.1Exhaust Fan (General)BasementPNL-VENT-BSMTEquipment Supplierunverified
EF-B.1Exhaust Fan (General)BasementPNL-VENT-BSMTEquipment Supplierunverified
EF-B.2Exhaust Fan (General)BasementPNL-VENT-BSMTEquipment Supplierunverified
EF-BS.1Exhaust Fan (General)BasementPNL-VENT-BSMTEquipment Supplierunverified
EF-BS.2Exhaust Fan (General)BasementPNL-VENT-BSMTEquipment Supplierunverified
EF-CHR.1Exhaust Fan (General)2nd FloorPNL-VENT-L2Equipment Supplierunverified
EF-CHR.2Exhaust Fan (General)2nd FloorPNL-VENT-L2Equipment Supplierunverified
EF-GLZ.1Exhaust Fan (General)BasementPNL-VENT-BSMTEquipment Supplierunverified
EF-GLZ.2Exhaust Fan (General)BasementPNL-VENT-BSMTEquipment Supplierunverified
EF-GS.1Exhaust Fan (General)2nd FloorPNL-VENT-L2Equipment Supplierunverified
EF-GS.2Exhaust Fan (General)2nd FloorPNL-VENT-L2Equipment Supplierunverified
EF-HP.1Exhaust Fan (General)BasementPNL-VENT-BSMTEquipment Supplierunverified
EF-LPG.1Exhaust Fan (General)GF Main LobbyPNL-VENT-GFEquipment Supplierunverified
EF-MC.1Exhaust Fan (General)BasementPNL-VENT-BSMTEquipment Supplierunverified
EF-MFP.1Exhaust Fan (General)BasementPNL-VENT-BSMTEquipment Supplierunverified
EF-MRF.1Exhaust Fan (General)GF Main LobbyPNL-VENT-GFEquipment Supplierunverified
EF-PR.1Exhaust Fan (General)BasementPNL-VENT-BSMTEquipment Supplierunverified
EF-PR.2Exhaust Fan (General)BasementPNL-VENT-BSMTEquipment Supplierunverified
EF-RD.1Exhaust Fan (General)RoofdeckPNL-VENT-RDEquipment Supplierunverified
EF-RD.2Exhaust Fan (General)RoofdeckPNL-VENT-RDEquipment Supplierunverified
EF-RR.2Exhaust Fan (General)BasementPNL-VENT-BSMTEquipment Supplierunverified
HDR-CHW-BPCHW Bypass Header2F/CHW Pump RoomPNL-CHWP-L2BMS Contractorunverified
HDR-CHWRCHW Return Main Header2F/CHW Pump RoomPNL-CHWP-L2BMS Contractorunverified
HDR-CHWSCHW Supply Main Header2F/CHW Pump RoomPNL-CHWP-L2BMS Contractorunverified
HDR-CWR-RDCondenser Water HeaderRoofdeck/Cooling Tower AreaPNL-CT-RDBMS Contractorunverified
HDR-CWS-RDCondenser Water HeaderRoofdeck/Cooling Tower AreaPNL-CT-RDBMS Contractorunverified
HDR-HW-HZHot Water Header SetRoofdeck/HW PlantPNL-PL-HZBMS Contractorunverified
HDR-HW-LZHot Water Header SetLower Ground/HW PlantPNL-PL-LZBMS Contractorunverified
HP-HZ-1Heat PumpRoofdeck/HW PlantPNL-PL-HZEquipment Supplierunverified
HP-HZ-2Heat PumpRoofdeck/HW PlantPNL-PL-HZEquipment Supplierunverified
HP-HZ-3Heat PumpRoofdeck/HW PlantPNL-PL-HZEquipment Supplierunverified
HP-LZ-1Heat PumpLower Ground/HW PlantPNL-PL-LZEquipment Supplierunverified
HP-LZ-2Heat PumpLower Ground/HW PlantPNL-PL-LZEquipment Supplierunverified
HP-LZ-3Heat PumpLower Ground/HW PlantPNL-PL-LZEquipment Supplierunverified
HWT-HZ-1Calorifier (Hot Water Storage Tank)Roofdeck/HW PlantPNL-PL-HZBMS Contractorunverified
HWT-HZ-2Calorifier (Hot Water Storage Tank)Roofdeck/HW PlantPNL-PL-HZBMS Contractorunverified
HWT-HZ-3Calorifier (Hot Water Storage Tank)Roofdeck/HW PlantPNL-PL-HZBMS Contractorunverified
HWT-LZ-1Calorifier (Hot Water Storage Tank)Lower Ground/HW PlantPNL-PL-LZBMS Contractorunverified
HWT-LZ-2Calorifier (Hot Water Storage Tank)Lower Ground/HW PlantPNL-PL-LZBMS Contractorunverified
HWT-LZ-3Calorifier (Hot Water Storage Tank)Lower Ground/HW PlantPNL-PL-LZBMS Contractorunverified
MTR-FDR-01Multifunction Power Meter (Feeder)Distribution (per A4)PNL-EE-DISTBMS Contractorunverified
MTR-FDR-02Multifunction Power Meter (Feeder)Distribution (per A4)PNL-EE-DISTBMS Contractorunverified
MTR-FDR-03Multifunction Power Meter (Feeder)Distribution (per A4)PNL-EE-DISTBMS Contractorunverified
MTR-FDR-04Multifunction Power Meter (Feeder)Distribution (per A4)PNL-EE-DISTBMS Contractorunverified
MTR-FDR-05Multifunction Power Meter (Feeder)Distribution (per A4)PNL-EE-DISTBMS Contractorunverified
MTR-FDR-06Multifunction Power Meter (Feeder)Distribution (per A4)PNL-EE-DISTBMS Contractorunverified
MTR-FDR-07Multifunction Power Meter (Feeder)Distribution (per A4)PNL-EE-DISTBMS Contractorunverified
MTR-FDR-08Multifunction Power Meter (Feeder)Distribution (per A4)PNL-EE-DISTBMS Contractorunverified
MTR-FDR-09Multifunction Power Meter (Feeder)Distribution (per A4)PNL-EE-DISTBMS Contractorunverified
MTR-FDR-10Multifunction Power Meter (Feeder)Distribution (per A4)PNL-EE-DISTBMS Contractorunverified
MTR-MAIN-1Multifunction Power Meter (Main)Main Switchgear RoomPNL-EE-MAINBMS Contractorunverified
MTR-MAIN-2Multifunction Power Meter (Main)Main Switchgear RoomPNL-EE-MAINBMS Contractorunverified
MTR-MAIN-3Multifunction Power Meter (Main)Main Switchgear RoomPNL-EE-MAINBMS Contractorunverified
OZ-2M.1Ozone Generator (UV-light or Corona)2nd Level/Casino MVAC PlantPNL-AHU-L2Equipment Supplierunverified
OZ-2M.2Ozone Generator (UV-light or Corona)2nd Level/Casino MVAC PlantPNL-AHU-L2Equipment Supplierunverified
PAHU-RD.1Precooled Air Handling UnitRoofdeck/PAHU PlantPNL-PAHU-RDEquipment Supplierunverified
PAHU-RD.2Precooled Air Handling UnitRoofdeck/PAHU PlantPNL-PAHU-RDEquipment Supplierunverified
PCHWP-1Primary CHW Pump2F/CHW Pump RoomPNL-CHWP-L2Equipment Supplierunverified
PCHWP-2Primary CHW Pump2F/CHW Pump RoomPNL-CHWP-L2Equipment Supplierunverified
PCHWP-3Primary CHW Pump2F/CHW Pump RoomPNL-CHWP-L2Equipment Supplierunverified
PCHWP-4Primary CHW Pump (Standby)2F/CHW Pump RoomPNL-CHWP-L2Equipment Supplierunverified
RP-HZ-1Recirculating PumpRoofdeck/HW PlantPNL-PL-HZEquipment Supplierunverified
RP-HZ-2Recirculating PumpRoofdeck/HW PlantPNL-PL-HZEquipment Supplierunverified
RP-HZ-3Recirculating PumpRoofdeck/HW PlantPNL-PL-HZEquipment Supplierunverified
RP-LZ-1Recirculating PumpLower Ground/HW PlantPNL-PL-LZEquipment Supplierunverified
RP-LZ-2Recirculating PumpLower Ground/HW PlantPNL-PL-LZEquipment Supplierunverified
RP-LZ-3Recirculating PumpLower Ground/HW PlantPNL-PL-LZEquipment Supplierunverified
SB-1Steam BoilerLower Ground/Boiler RoomPNL-BL-LZEquipment Supplierunverified
SB-2Steam BoilerLower Ground/Boiler RoomPNL-BL-LZEquipment Supplierunverified
TEF-1.1Exhaust Fan (Toilet)GF Main LobbyPNL-VENT-GFEquipment Supplierunverified
TEF-1.2Exhaust Fan (Toilet)GF Main LobbyPNL-VENT-GFEquipment Supplierunverified
TEF-1.3Exhaust Fan (Toilet)GF Main LobbyPNL-VENT-GFEquipment Supplierunverified
TEF-1.4Exhaust Fan (Toilet)GF Main LobbyPNL-VENT-GFEquipment Supplierunverified
TEF-2.1Exhaust Fan (Toilet)2nd FloorPNL-VENT-L2Equipment Supplierunverified
TEF-2.3Exhaust Fan (Toilet)2nd FloorPNL-VENT-L2Equipment Supplierunverified
TEF-2B.3Exhaust Fan (Toilet)2nd FloorPNL-VENT-L2Equipment Supplierunverified
TEF-3A.1Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3A.2Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3BExhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3C.1Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3C.2Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.1Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.10Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.11Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.12Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.13Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.14Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.15Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.16Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.17Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.18Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.19Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.2Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.20Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.3Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.4Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.5Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.6Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.7Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.8Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-3D.9Exhaust Fan (Toilet)3rd Amenity & GuestroomPNL-VENT-L3Equipment Supplierunverified
TEF-B.1Exhaust Fan (Toilet)BasementPNL-VENT-BSMTEquipment Supplierunverified
TEF-B.2Exhaust Fan (Toilet)BasementPNL-VENT-BSMTEquipment Supplierunverified

Verification schema

How to record verification / corrections in A2-equipment-takeoff.yaml
Find the affected row in the YAML by ID (Detail sheet column A) and add a verification: block:
- id: AHU-01
verification: # ADDED by team
status: needs_correction # unverified | verified | needs_correction | uncertain
corrected_location: 3rd Floor Mech Room # team's measured / confirmed value
verified_by: J. Cruz
verified_date: 2026-05-10
drawing_ref: "EE-09 grid B-2"
notes: ""
After saving, re-run: python3 _playbook/tools/generate-deliverables.py <project>
Corrections propagate to B4 manhours, BOQ, and final deliverables automatically.
Recommended verification methods (priority order):
1. Site walkthrough with measurement (most accurate; for cable lengths, after structural completion).
2. Properly-scaled architectural drawings.
3. Mechanical contractor's tray layout combined with BMS panel locations.
4. A-001 default with ±20% contingency in BOQ — last resort.