Summary
| A1 — I/O List, Audit View | |||||
| Project | Kingsford Hotel Bacolod — BMS | ||||
| Canonical source | A1-io-list.yaml | ||||
| How to record corrections | Edit the canonical YAML directly — add a verification: block to the affected row(s) | ||||
| Totals | |||||
| Total I/O points | 744 | ||||
| Unique equipment instances | 109 | ||||
| Systems represented | 5 | ||||
| Verification status | |||||
| Status | Count | % of total | |||
| verified | 0 | 0% | |||
| needs_correction | 0 | 0% | |||
| uncertain | 0 | 0% | |||
| unverified | 744 | 100% | |||
| ⚠ Known weak points | |||||
| Equipment quantities are derived from the customer's points list. Cross-verify against mechanical floor plans (Q-008) and architectural plans (Q-005). Where the points list shows aggregate counts without per-tag enumeration, the gap is captured as Q-021. | |||||
| How corrections flow | |||||
| Edit A1-io-list.yaml — add a verification: block to any row where you confirm or correct the equipment, location, or panel assignment. | |||||
| Re-run the deliverables generator to refresh downstream artifacts. | |||||
By System
| System | Equipment instances | I/O points |
| VENT | 60 | 343 |
| AC | 34 | 365 |
| HWL | 8 | 20 |
| EL | 6 | 12 |
| FDAS | 1 | 4 |
| TOTAL | 109 | 744 |
By Location
| Location | Equipment instances |
| 2nd Level Chiller Room | 15 |
| Roof Deck | 11 |
| 2nd Level BOH | 6 |
| 2nd Mezzanine (Casino) | 5 |
| 3rd Floor | 5 |
| Lower Ground HWL Room | 4 |
| Roof Deck HWL Area | 4 |
| GF Main Lobby Toilet | 4 |
| 2nd Floor | 4 |
| 3rd Floor Toilet | 4 |
| Ground Floor BOH | 3 |
| Basement | 3 |
| Lower Ground Boiler Room | 2 |
| 2nd Level Pre-Function | 2 |
| 2nd Floor Toilet | 2 |
| 2nd Floor BOH | 2 |
| 2nd Floor General Service | 2 |
| 3rd Floor Amenity Toilet | 2 |
| Basement Toilet | 2 |
| Basement Service | 2 |
| Basement Garbage Lobby | 2 |
| Basement Battery Room | 2 |
| Basement Pump Room | 2 |
| Roof Deck CT Area | 1 |
| 2nd Level Executive Lounge | 1 |
| 2nd Level Function Room 2 | 1 |
| 2nd Level Function Room 3 | 1 |
| 2nd Level Function Rooms | 1 |
| 2nd Floor BOH Toilet | 1 |
| 2nd Floor OHR | 1 |
| 3rd Floor BOH | 1 |
| Basement FOST Room | 1 |
| Basement Wash Service | 1 |
| Basement Mech / Pump | 1 |
| Basement Main Fire Riser | 1 |
| Lower Ground Main Switchroom | 1 |
| 2nd Level Chiller MCC | 1 |
| 2nd Level AHU MCC | 1 |
| Ground Floor AHU MCC | 1 |
| Lower Ground Lighting Panel A | 1 |
| Lower Ground Lighting Panel B | 1 |
| Ground Floor Fire Command Center | 1 |
By Panel
| Panel | Equipment instances |
| DDC-2F-BOH | 25 |
| DDC-B1-BOH | 17 |
| DDC-2F-CHILLER | 16 |
| DDC-RD-PLANT | 16 |
| DDC-3F | 12 |
| DDC-LG-PLANT | 9 |
| DDC-GF-BOH | 9 |
| DDC-2M-CASINO | 5 |
Verification schema
| How to record verification / corrections in A1-io-list.yaml | |||||||
| Find the affected row in the YAML by ID (Detail sheet column A) and add a verification: block: | |||||||
| - id: chws.ch-1.entering-chw-temp | |||||||
| verification: # ADDED by team | |||||||
| status: needs_correction # unverified | verified | needs_correction | uncertain | |||||||
| verified_by: J. Cruz | |||||||
| verified_date: 2026-05-10 | |||||||
| drawing_ref: "EE-09 grid B-2" | |||||||
| notes: "" | |||||||
| After saving, re-run: python3 _playbook/tools/generate-deliverables.py <project> | |||||||
| Corrections propagate to B4 manhours, BOQ, and final deliverables automatically. | |||||||
| Recommended verification methods (priority order): | |||||||
| 1. Site walkthrough with measurement (most accurate; for cable lengths, after structural completion). | |||||||
| 2. Properly-scaled architectural drawings. | |||||||
| 3. Mechanical contractor's tray layout combined with BMS panel locations. | |||||||
| 4. A-001 default with ±20% contingency in BOQ — last resort. | |||||||