Summary

A1 — I/O List, Audit View
ProjectKingsford Hotel Bacolod — BMS
Canonical sourceA1-io-list.yaml
How to record correctionsEdit the canonical YAML directly — add a verification: block to the affected row(s)
Totals
Total I/O points744
Unique equipment instances109
Systems represented5
Verification status
StatusCount% of total
verified00%
needs_correction00%
uncertain00%
unverified744100%
⚠ Known weak points
Equipment quantities are derived from the customer's points list. Cross-verify against mechanical floor plans (Q-008) and architectural plans (Q-005). Where the points list shows aggregate counts without per-tag enumeration, the gap is captured as Q-021.
How corrections flow
Edit A1-io-list.yaml — add a verification: block to any row where you confirm or correct the equipment, location, or panel assignment.
Re-run the deliverables generator to refresh downstream artifacts.

By System

SystemEquipment instancesI/O points
VENT60343
AC34365
HWL820
EL612
FDAS14
TOTAL109744

By Location

LocationEquipment instances
2nd Level Chiller Room15
Roof Deck11
2nd Level BOH6
2nd Mezzanine (Casino)5
3rd Floor5
Lower Ground HWL Room4
Roof Deck HWL Area4
GF Main Lobby Toilet4
2nd Floor4
3rd Floor Toilet4
Ground Floor BOH3
Basement3
Lower Ground Boiler Room2
2nd Level Pre-Function2
2nd Floor Toilet2
2nd Floor BOH2
2nd Floor General Service2
3rd Floor Amenity Toilet2
Basement Toilet2
Basement Service2
Basement Garbage Lobby2
Basement Battery Room2
Basement Pump Room2
Roof Deck CT Area1
2nd Level Executive Lounge1
2nd Level Function Room 21
2nd Level Function Room 31
2nd Level Function Rooms1
2nd Floor BOH Toilet1
2nd Floor OHR1
3rd Floor BOH1
Basement FOST Room1
Basement Wash Service1
Basement Mech / Pump1
Basement Main Fire Riser1
Lower Ground Main Switchroom1
2nd Level Chiller MCC1
2nd Level AHU MCC1
Ground Floor AHU MCC1
Lower Ground Lighting Panel A1
Lower Ground Lighting Panel B1
Ground Floor Fire Command Center1

By Panel

PanelEquipment instances
DDC-2F-BOH25
DDC-B1-BOH17
DDC-2F-CHILLER16
DDC-RD-PLANT16
DDC-3F12
DDC-LG-PLANT9
DDC-GF-BOH9
DDC-2M-CASINO5

Verification schema

How to record verification / corrections in A1-io-list.yaml
Find the affected row in the YAML by ID (Detail sheet column A) and add a verification: block:
- id: chws.ch-1.entering-chw-temp
verification: # ADDED by team
status: needs_correction # unverified | verified | needs_correction | uncertain
verified_by: J. Cruz
verified_date: 2026-05-10
drawing_ref: "EE-09 grid B-2"
notes: ""
After saving, re-run: python3 _playbook/tools/generate-deliverables.py <project>
Corrections propagate to B4 manhours, BOQ, and final deliverables automatically.
Recommended verification methods (priority order):
1. Site walkthrough with measurement (most accurate; for cable lengths, after structural completion).
2. Properly-scaled architectural drawings.
3. Mechanical contractor's tray layout combined with BMS panel locations.
4. A-001 default with ±20% contingency in BOQ — last resort.