Summary

A2 — Equipment Takeoff Summary
Total instances23
By equipment class
Exhaust Fan (General)4
AHU (Chilled-Water-Served)2
CHW Supply Main Header2
Heat Pump2
Calorifier (Hot Water Storage Tank)2
Precooled Air Handling Unit2
Recirculating Pump2
Condenser Water Pump1
Chiller (Package Water-Cooled)1
Primary CHW Pump1
Cooling Tower1
DOAS Unit1
Steam Boiler1
Ozone Generator (UV-light or Corona)1
By location
2F9
RD7
LG5
GF1
3F1
By panel
BMS-PNL-CHWPLANT-2F4
BMS-PNL-PLUMBING-LG4
BMS-PNL-PLUMBING-RD3
BMS-PNL-AHU-RD2
BMS-PNL-CASINO-2F2
BMS-PNL-BOHAHU-2F1
BMS-PNL-CT-RD1
BMS-PNL-VENT-RD1
BMS-PNL-AHU-2F1
BMS-PNL-BOILER-LG1
BMS-PNL-VENT-GF1
BMS-PNL-VENT-2F1
BMS-PNL-VENT-3F1

Equipment Takeoff

IDEquipment ClassQuantityLocationSystemPanelPrimary C/OPhysical I/OHLI SubpointsNetwork DropsTotal I/OMake/Model AssumedNetwork TypeTypical SupplierNotes
AHU-2/B.2/B.3/PP/CL/FRE/FRDAHU (Chilled-Water-Served)12FAir Handling — Basement / Podium BOHBMS-PNL-BOHAHU-2FBMS Contractor120200140Standard CHW-served AHU with VFD-driven supply fan, modulating CHW valve, and OA/RA dampersHardwired (VFD via BACnet HLI)Mechanical contractorBMS supplies sensors (T/RH/CO2). Dampers and CHW valve supplied by ME contractor. Fan + VFD by Equipment Supplier.
AHU-RD (with CHW mod valve)AHU (Chilled-Water-Served)1RDAir Handling — Roofdeck AHUBMS-PNL-AHU-RDBMS Contractor320032Standard CHW-served AHU with VFD-driven supply fan, modulating CHW valve, and OA/RA dampersHardwired (VFD via BACnet HLI)Mechanical contractorBMS supplies sensors (T/RH/CO2). Dampers and CHW valve supplied by ME contractor. Fan + VFD by Equipment Supplier.
CDWP-1 to CDWP-3Condenser Water Pump12FChilled Water PlantBMS-PNL-CHWPLANT-2FME Contractor120012End-suction or split-case centrifugal, fixed-speed (typical) or VFD (energy-conscious)HardwiredMechanical contractorBMS reads aux contacts; commands start via DO.
CH-1 to CH-3Chiller (Package Water-Cooled)12FChilled Water PlantBMS-PNL-CHWPLANT-2FME Contractor810081Tier-1 BACnet IP chiller (Trane/York/Carrier/Daikin), water-cooled centrifugal or screw, sized per design cooling loadBACnet/IPMechanical contractor / Equipment supplierBMS reads via chiller's native BACnet gateway. BMS supplies external T-sensors on entering/leaving CHW & CW pipes.
CHW Supply & Return Main HeaderCHW Supply Main Header12FChilled Water PlantBMS-PNL-CHWPLANT-2FBMS Contractor7007BMS T+P sensors on CHW supply manifoldHardwiredBMS contractorField instrumentation only.
CHWP-1 to CHWP-3Primary CHW Pump12FChilled Water PlantBMS-PNL-CHWPLANT-2FME Contractor210021End-suction or split-case centrifugal with VFD, sized per design CHW flowHardwired (BMS reads VFD via BACnet HLI)Mechanical contractorVFD typically Equipment Supplier provided with BACnet card.
CT-1 to CT-3Cooling Tower1RDHeat Rejection — Cooling TowerBMS-PNL-CT-RDBMS Contractor351036Induced-draft counterflow open cooling tower (Marley/BAC/EVAPCO), sized per condenser water flowHardwiredMechanical contractor / Equipment supplierBMS supplies basin level sensors and condenser water header T-sensors.
DOAS (Casino) — 2 unitsDOAS Unit12FCasino MVAC — Dedicated Outdoor AirBMS-PNL-CASINO-2FBMS Contractor264030Dedicated Outdoor Air System with energy recovery wheel, supply + exhaust fans, CHW coilBACnet/IPMechanical contractor / Equipment supplierNative BACnet controller typical. BMS supplies external sensors (OA T/RH/Flow, indoor T/RH, exhaust T) and modulating valve actuator.
EF-RD.1/RD.2, EF-1Exhaust Fan (General)1RDGeneral VentilationBMS-PNL-VENT-RDME Contractor9009Constant-speed in-line, ceiling, or roof-mounted general exhaust fanHardwiredMechanical contractorBMS reads aux contacts only — no control points.
HP-HZ (×3)Heat Pump1RDPlumbing — Sanitary Hot WaterBMS-PNL-PLUMBING-RDEquipment Supplier0909Air-source or water-source heat pump for hot water heatingHardwired (LZ) or HLI (HZ — per A-PL-001)Plumbing contractor / Equipment supplierBMS reads pump status/HOA/trip via aux contacts.
HP-LZ (×3)Heat Pump1LGPlumbing — Sanitary Hot WaterBMS-PNL-PLUMBING-LGEquipment Supplier0909Air-source or water-source heat pump for hot water heatingHardwired (LZ) or HLI (HZ — per A-PL-001)Plumbing contractor / Equipment supplierBMS reads pump status/HOA/trip via aux contacts.
HW Supply & Return Header (LG)CHW Supply Main Header1LGPlumbing — Sanitary Hot WaterBMS-PNL-PLUMBING-LGBMS Contractor6006BMS T+P sensors on CHW supply manifoldHardwiredBMS contractorField instrumentation only.
HWT-HZ (×3)Calorifier (Hot Water Storage Tank)1RDPlumbing — Sanitary Hot WaterBMS-PNL-PLUMBING-RDBMS Contractor3003Pressurised hot-water storage tank with internal coil, sized per design hot water demandHardwiredPlumbing contractorBMS supplies tank temperature sensor (immersion or strapped probe).
HWT-LZ (×3)Calorifier (Hot Water Storage Tank)1LGPlumbing — Sanitary Hot WaterBMS-PNL-PLUMBING-LGBMS Contractor3003Pressurised hot-water storage tank with internal coil, sized per design hot water demandHardwiredPlumbing contractorBMS supplies tank temperature sensor (immersion or strapped probe).
PAHU-0.1Precooled Air Handling Unit12FAir Handling — Pre-cooledBMS-PNL-AHU-2FBMS Contractor124016Precool AHU at Roofdeck with CHW coil, VFD-driven fresh air fan; no exhaust pathHardwired (VFD via BACnet HLI)Mechanical contractor / Equipment supplierPrecool function: cools outdoor air before it's distributed to other systems. BMS supplies OA/supply T sensors.
PAHU-RD (×2)Precooled Air Handling Unit1RDAir Handling — Pre-cooled (Roofdeck)BMS-PNL-AHU-RDME Contractor122014Precool AHU at Roofdeck with CHW coil, VFD-driven fresh air fan; no exhaust pathHardwired (VFD via BACnet HLI)Mechanical contractor / Equipment supplierPrecool function: cools outdoor air before it's distributed to other systems. BMS supplies OA/supply T sensors.
RP-HZ (×3)Recirculating Pump1RDPlumbing — Sanitary Hot WaterBMS-PNL-PLUMBING-RDME Contractor9009Hot water recirculating pump, fixed-speed (typical for hotwater systems)Hardwired (LZ) or HLI (HZ — per A-PL-001)Plumbing contractorBMS reads aux contacts only.
RP-LZ (×3)Recirculating Pump1LGPlumbing — Sanitary Hot WaterBMS-PNL-PLUMBING-LGME Contractor9009Hot water recirculating pump, fixed-speed (typical for hotwater systems)Hardwired (LZ) or HLI (HZ — per A-PL-001)Plumbing contractorBMS reads aux contacts only.
SB-1 & SB-2Steam Boiler1LGBoiler / LaundryBMS-PNL-BOILER-LGME Contractor220022Fire-tube steam boiler with multi-stage burner, fuel-oil fired (typical for hotel laundry)HardwiredMechanical contractor / Equipment supplierBMS supplies steam pressure, feedwater T, fluegas T+O2 sensors. Boiler equipment provides aux contacts for status/HOA/trip points.
Sanitizer for AHU-2M.1/2M.2Ozone Generator (UV-light or Corona)12FCasino MVAC — Smoke SanitizerBMS-PNL-CASINO-2FEquipment Supplier4004UV-light or corona-discharge ozone generator (paired with Casino AHU)HardwiredEquipment supplierCasino-specific air-treatment device. BMS monitors status/trip and reads VOC sensor (BMS-supplied).
TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1Exhaust Fan (General)1GFGeneral VentilationBMS-PNL-VENT-GFME Contractor270027Constant-speed in-line, ceiling, or roof-mounted general exhaust fanHardwiredMechanical contractorBMS reads aux contacts only — no control points.
TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 + EF-CHRx2Exhaust Fan (General)12FGeneral VentilationBMS-PNL-VENT-2FME Contractor390039Constant-speed in-line, ceiling, or roof-mounted general exhaust fanHardwiredMechanical contractorBMS reads aux contacts only — no control points.
TEF-3Ax2/3B/3Cx2/3Dx20 + othersExhaust Fan (General)13FGeneral VentilationBMS-PNL-VENT-3FME Contractor810081Constant-speed in-line, ceiling, or roof-mounted general exhaust fanHardwiredMechanical contractorBMS reads aux contacts only — no control points.