Summary

A1 — Consolidated I/O List Summary
ProjectKingsford Hotel Bacolod — BMS
Total I/O rows554
By type
DI203
DO183
AI93
AO44
HLI23
Network8
By C/O
Equipment Supplier328
ME Contractor128
BMS Contractor98
By system
VENT-FCU270
VENT-AHU72
VENT-DOAS63
HVAC-Pumps29
HVAC-Cooling-Towers20
HVAC-Chillers16
Power-EE13
VENT-EAS12
PL-RecircPumps12
VENT-PAHU10
PL-HeatPumps9
PL-Boiler8
Network8
PL-Calorifiers6
PL-HotWater6
By panel
PNL-GF140
PNL-2F139
PNL-3F106
PNL-CHPLANT-GND76
PNL-RD55
PNL-BSMT24
PNL-BOH-2F13
PNL-HE-GF1

All IO Points

IDSystemEquipment ClassEquipment InstanceLocationPoint DescriptionTypeField DeviceC/ODoO RefPanelSourceNotes
P0001HVAC-ChillersChiller (Package Water-Cooled)CH-1Plant Room (Basement)Chiller 1 BACnet HLI (status, motor current, kW, evap/cond temps, refrigerant pressures, oil sump T+P)HLIBACnet IP cardEquipment SupplierDoO: Chiller plant sequencingPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0002HVAC-ChillersCHW Supply Main HeaderHDR-CHWSPlant RoomEntering Chilled Water Temperature CH-1AITemperature SensorBMS ContractorDoO: ChillerPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0003HVAC-ChillersCHW Return Main HeaderHDR-CHWRPlant RoomLeaving Chilled Water Temperature CH-1AITemperature SensorBMS ContractorDoO: ChillerPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0004HVAC-ChillersCondenser Water HeaderHDR-COWRoofdeckCondenser Water Supply T CH-1AITemperature SensorBMS ContractorDoO: ChillerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0005HVAC-ChillersChiller (Package Water-Cooled)CH-2Plant Room (Basement)Chiller 2 BACnet HLI (status, motor current, kW, evap/cond temps, refrigerant pressures, oil sump T+P)HLIBACnet IP cardEquipment SupplierDoO: Chiller plant sequencingPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0006HVAC-ChillersCHW Supply Main HeaderHDR-CHWSPlant RoomEntering Chilled Water Temperature CH-2AITemperature SensorBMS ContractorDoO: ChillerPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0007HVAC-ChillersCHW Return Main HeaderHDR-CHWRPlant RoomLeaving Chilled Water Temperature CH-2AITemperature SensorBMS ContractorDoO: ChillerPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0008HVAC-ChillersCondenser Water HeaderHDR-COWRoofdeckCondenser Water Supply T CH-2AITemperature SensorBMS ContractorDoO: ChillerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0009HVAC-ChillersChiller (Package Water-Cooled)CH-3Plant Room (Basement)Chiller 3 BACnet HLI (status, motor current, kW, evap/cond temps, refrigerant pressures, oil sump T+P)HLIBACnet IP cardEquipment SupplierDoO: Chiller plant sequencingPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0010HVAC-ChillersCHW Supply Main HeaderHDR-CHWSPlant RoomEntering Chilled Water Temperature CH-3AITemperature SensorBMS ContractorDoO: ChillerPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0011HVAC-ChillersCHW Return Main HeaderHDR-CHWRPlant RoomLeaving Chilled Water Temperature CH-3AITemperature SensorBMS ContractorDoO: ChillerPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0012HVAC-ChillersCondenser Water HeaderHDR-COWRoofdeckCondenser Water Supply T CH-3AITemperature SensorBMS ContractorDoO: ChillerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0013HVAC-ChillersCHW Bypass HeaderHDR-CHW-BPPlant RoomCHW differential pressureAIDifferential Pressure SensorBMS ContractorDoO: PlantPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0014HVAC-ChillersCHW Bypass HeaderHDR-CHW-BPPlant RoomBypass valve commandAOElectric Valve ActuatorBMS ContractorDoO: PlantPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0015HVAC-ChillersCHW Bypass HeaderHDR-CHW-BPPlant RoomBypass valve statusAIPosition FeedbackBMS ContractorDoO: PlantPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0016HVAC-ChillersBTU MeterBTU-CHWS-MAINPlant RoomPlant CHW BTU (Modbus: flow, supply T, return T, kW, kWh)HLIUltrasonic BTU MeterBMS ContractorDoO: Energy reportingPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002Modbus
P0017HVAC-PumpsPrimary CHW PumpCHWP-1.1Plant RoomPump motor statusDIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0018HVAC-PumpsPrimary CHW PumpCHWP-1.1Plant RoomPump HOA statusDIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0019HVAC-PumpsPrimary CHW PumpCHWP-1.1Plant RoomPump trip alarmDIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0020HVAC-PumpsPrimary CHW PumpCHWP-1.1Plant RoomVFD speed feedback (BACnet HLI)HLIVFD BACnet cardEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0021HVAC-PumpsPrimary CHW PumpCHWP-1.1Plant RoomVFD speed command (BACnet HLI)HLIVFD BACnet cardEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0022HVAC-PumpsPrimary CHW PumpCHWP-1.2Plant RoomPump motor statusDIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0023HVAC-PumpsPrimary CHW PumpCHWP-1.2Plant RoomPump HOA statusDIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0024HVAC-PumpsPrimary CHW PumpCHWP-1.2Plant RoomPump trip alarmDIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0025HVAC-PumpsPrimary CHW PumpCHWP-1.2Plant RoomVFD speed feedback (BACnet HLI)HLIVFD BACnet cardEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0026HVAC-PumpsPrimary CHW PumpCHWP-1.2Plant RoomVFD speed command (BACnet HLI)HLIVFD BACnet cardEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0027HVAC-PumpsPrimary CHW PumpCHWP-1.3Plant RoomPump motor statusDIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0028HVAC-PumpsPrimary CHW PumpCHWP-1.3Plant RoomPump HOA statusDIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0029HVAC-PumpsPrimary CHW PumpCHWP-1.3Plant RoomPump trip alarmDIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0030HVAC-PumpsPrimary CHW PumpCHWP-1.3Plant RoomVFD speed feedback (BACnet HLI)HLIVFD BACnet cardEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0031HVAC-PumpsPrimary CHW PumpCHWP-1.3Plant RoomVFD speed command (BACnet HLI)HLIVFD BACnet cardEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0032HVAC-PumpsPrimary CHW Pump (Standby)CHWP-1.STBYPlant RoomPump motor status (standby)DIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0033HVAC-PumpsPrimary CHW Pump (Standby)CHWP-1.STBYPlant RoomPump trip alarm (standby)DIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0034HVAC-PumpsCondenser Water PumpCOWP-1Plant RoomPump motor statusDIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0035HVAC-PumpsCondenser Water PumpCOWP-1Plant RoomPump HOA statusDIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0036HVAC-PumpsCondenser Water PumpCOWP-1Plant RoomPump trip alarmDIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0037HVAC-PumpsCondenser Water PumpCOWP-1Plant RoomPump start commandDORelay OutputEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0038HVAC-PumpsCondenser Water PumpCOWP-2Plant RoomPump motor statusDIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0039HVAC-PumpsCondenser Water PumpCOWP-2Plant RoomPump HOA statusDIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0040HVAC-PumpsCondenser Water PumpCOWP-2Plant RoomPump trip alarmDIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0041HVAC-PumpsCondenser Water PumpCOWP-2Plant RoomPump start commandDORelay OutputEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0042HVAC-PumpsCondenser Water PumpCOWP-3Plant RoomPump motor statusDIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0043HVAC-PumpsCondenser Water PumpCOWP-3Plant RoomPump HOA statusDIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0044HVAC-PumpsCondenser Water PumpCOWP-3Plant RoomPump trip alarmDIAuxiliary ContactEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0045HVAC-PumpsCondenser Water PumpCOWP-3Plant RoomPump start commandDORelay OutputEquipment SupplierDoO: PumpsPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0046HVAC-Cooling-TowersCooling TowerCT-1RoofdeckFan motor statusDIAuxiliary ContactEquipment SupplierDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0047HVAC-Cooling-TowersCooling TowerCT-1RoofdeckFan HOA statusDIAuxiliary ContactEquipment SupplierDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0048HVAC-Cooling-TowersCooling TowerCT-1RoofdeckFan trip alarmDIAuxiliary ContactEquipment SupplierDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0049HVAC-Cooling-TowersCooling TowerCT-1RoofdeckFan VFD speed commandAOVFD analog inputEquipment SupplierDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0050HVAC-Cooling-TowersCooling TowerCT-1RoofdeckFan VFD speed feedbackAIVFD analog outputEquipment SupplierDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0051HVAC-Cooling-TowersCooling TowerCT-1RoofdeckBasin water level lowDIFloat SwitchBMS ContractorDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0052HVAC-Cooling-TowersCooling TowerCT-2RoofdeckFan motor statusDIAuxiliary ContactEquipment SupplierDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0053HVAC-Cooling-TowersCooling TowerCT-2RoofdeckFan HOA statusDIAuxiliary ContactEquipment SupplierDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0054HVAC-Cooling-TowersCooling TowerCT-2RoofdeckFan trip alarmDIAuxiliary ContactEquipment SupplierDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0055HVAC-Cooling-TowersCooling TowerCT-2RoofdeckFan VFD speed commandAOVFD analog inputEquipment SupplierDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0056HVAC-Cooling-TowersCooling TowerCT-2RoofdeckFan VFD speed feedbackAIVFD analog outputEquipment SupplierDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0057HVAC-Cooling-TowersCooling TowerCT-2RoofdeckBasin water level lowDIFloat SwitchBMS ContractorDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0058HVAC-Cooling-TowersCooling TowerCT-3RoofdeckFan motor statusDIAuxiliary ContactEquipment SupplierDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0059HVAC-Cooling-TowersCooling TowerCT-3RoofdeckFan HOA statusDIAuxiliary ContactEquipment SupplierDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0060HVAC-Cooling-TowersCooling TowerCT-3RoofdeckFan trip alarmDIAuxiliary ContactEquipment SupplierDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0061HVAC-Cooling-TowersCooling TowerCT-3RoofdeckFan VFD speed commandAOVFD analog inputEquipment SupplierDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0062HVAC-Cooling-TowersCooling TowerCT-3RoofdeckFan VFD speed feedbackAIVFD analog outputEquipment SupplierDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0063HVAC-Cooling-TowersCooling TowerCT-3RoofdeckBasin water level lowDIFloat SwitchBMS ContractorDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0064HVAC-Cooling-TowersCooling Tower (Common)CT-COMMONRoofdeckOutdoor air temperatureAIOutdoor Temperature SensorBMS ContractorDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0065HVAC-Cooling-TowersCooling Tower (Common)CT-COMMONRoofdeckOutdoor air relative humidityAIHumidity SensorBMS ContractorDoO: Cooling towerPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0066VENT-DOASDOAS UnitDOAS-RDRoofdeckOA TemperatureAITemperature SensorBMS ContractorDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0067VENT-DOASDOAS UnitDOAS-RDRoofdeckOA HumidityAIHumidity SensorBMS ContractorDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0068VENT-DOASDOAS UnitDOAS-RDRoofdeckOA FlowAIFlow SensorBMS ContractorDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0069VENT-DOASDOAS UnitDOAS-RDRoofdeckIndoor Mixed Air TAITemperature SensorEquipment SupplierDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0070VENT-DOASDOAS UnitDOAS-RDRoofdeckIndoor Mixed Air RHAIHumidity SensorEquipment SupplierDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0071VENT-DOASDOAS UnitDOAS-RDRoofdeckIndoor Supply Air TAITemperature SensorBMS ContractorDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0072VENT-DOASDOAS UnitDOAS-RDRoofdeckIndoor Exhaust Air TAITemperature SensorBMS ContractorDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0073VENT-DOASDOAS UnitDOAS-RDRoofdeckRecovery wheel motor statusDIAuxiliary ContactEquipment SupplierDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0074VENT-DOASDOAS UnitDOAS-RDRoofdeckRecovery wheel trip alarmDIAuxiliary ContactEquipment SupplierDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0075VENT-DOASDOAS UnitDOAS-RDRoofdeckSupply fan motor statusDIAuxiliary ContactEquipment SupplierDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0076VENT-DOASDOAS UnitDOAS-RDRoofdeckSupply fan trip alarmDIAuxiliary ContactEquipment SupplierDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0077VENT-DOASDOAS UnitDOAS-RDRoofdeckSupply fan VFD speed commandAOVFD analog inputEquipment SupplierDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0078VENT-DOASDOAS UnitDOAS-RDRoofdeckSupply fan VFD speed feedbackAIVFD analog outputEquipment SupplierDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0079VENT-DOASDOAS UnitDOAS-RDRoofdeckExhaust fan motor statusDIAuxiliary ContactEquipment SupplierDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0080VENT-DOASDOAS UnitDOAS-RDRoofdeckExhaust fan trip alarmDIAuxiliary ContactEquipment SupplierDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0081VENT-DOASDOAS UnitDOAS-RDRoofdeckExhaust fan VFD speed commandAOVFD analog inputEquipment SupplierDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0082VENT-DOASDOAS UnitDOAS-RDRoofdeckExhaust fan VFD speed feedbackAIVFD analog outputEquipment SupplierDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0083VENT-DOASDOAS UnitDOAS-RDRoofdeckOA motorized damper statusDIDamper Position SwitchME ContractorDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0084VENT-DOASDOAS UnitDOAS-RDRoofdeckOA motorized damper commandAODamper ActuatorME ContractorDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0085VENT-DOASDOAS UnitDOAS-RDRoofdeckCHWS coil valve statusDIPosition FeedbackME ContractorDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0086VENT-DOASDOAS UnitDOAS-RDRoofdeckCHWS coil valve commandAOElectric Valve ActuatorME ContractorDoO: DOASPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0087VENT-DOASDOAS UnitDOAS-GFGFOA TemperatureAITemperature SensorBMS ContractorDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0088VENT-DOASDOAS UnitDOAS-GFGFOA HumidityAIHumidity SensorBMS ContractorDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0089VENT-DOASDOAS UnitDOAS-GFGFOA FlowAIFlow SensorBMS ContractorDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0090VENT-DOASDOAS UnitDOAS-GFGFIndoor Mixed Air TAITemperature SensorEquipment SupplierDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0091VENT-DOASDOAS UnitDOAS-GFGFIndoor Mixed Air RHAIHumidity SensorEquipment SupplierDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0092VENT-DOASDOAS UnitDOAS-GFGFIndoor Supply Air TAITemperature SensorBMS ContractorDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0093VENT-DOASDOAS UnitDOAS-GFGFIndoor Exhaust Air TAITemperature SensorBMS ContractorDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0094VENT-DOASDOAS UnitDOAS-GFGFRecovery wheel motor statusDIAuxiliary ContactEquipment SupplierDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0095VENT-DOASDOAS UnitDOAS-GFGFRecovery wheel trip alarmDIAuxiliary ContactEquipment SupplierDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0096VENT-DOASDOAS UnitDOAS-GFGFSupply fan motor statusDIAuxiliary ContactEquipment SupplierDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0097VENT-DOASDOAS UnitDOAS-GFGFSupply fan trip alarmDIAuxiliary ContactEquipment SupplierDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0098VENT-DOASDOAS UnitDOAS-GFGFSupply fan VFD speed commandAOVFD analog inputEquipment SupplierDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0099VENT-DOASDOAS UnitDOAS-GFGFSupply fan VFD speed feedbackAIVFD analog outputEquipment SupplierDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0100VENT-DOASDOAS UnitDOAS-GFGFExhaust fan motor statusDIAuxiliary ContactEquipment SupplierDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0101VENT-DOASDOAS UnitDOAS-GFGFExhaust fan trip alarmDIAuxiliary ContactEquipment SupplierDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0102VENT-DOASDOAS UnitDOAS-GFGFExhaust fan VFD speed commandAOVFD analog inputEquipment SupplierDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0103VENT-DOASDOAS UnitDOAS-GFGFExhaust fan VFD speed feedbackAIVFD analog outputEquipment SupplierDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0104VENT-DOASDOAS UnitDOAS-GFGFOA motorized damper statusDIDamper Position SwitchME ContractorDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0105VENT-DOASDOAS UnitDOAS-GFGFOA motorized damper commandAODamper ActuatorME ContractorDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0106VENT-DOASDOAS UnitDOAS-GFGFCHWS coil valve statusDIPosition FeedbackME ContractorDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0107VENT-DOASDOAS UnitDOAS-GFGFCHWS coil valve commandAOElectric Valve ActuatorME ContractorDoO: DOASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0108VENT-DOASDOAS UnitDOAS-2F2FOA TemperatureAITemperature SensorBMS ContractorDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0109VENT-DOASDOAS UnitDOAS-2F2FOA HumidityAIHumidity SensorBMS ContractorDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0110VENT-DOASDOAS UnitDOAS-2F2FOA FlowAIFlow SensorBMS ContractorDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0111VENT-DOASDOAS UnitDOAS-2F2FIndoor Mixed Air TAITemperature SensorEquipment SupplierDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0112VENT-DOASDOAS UnitDOAS-2F2FIndoor Mixed Air RHAIHumidity SensorEquipment SupplierDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0113VENT-DOASDOAS UnitDOAS-2F2FIndoor Supply Air TAITemperature SensorBMS ContractorDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0114VENT-DOASDOAS UnitDOAS-2F2FIndoor Exhaust Air TAITemperature SensorBMS ContractorDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0115VENT-DOASDOAS UnitDOAS-2F2FRecovery wheel motor statusDIAuxiliary ContactEquipment SupplierDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0116VENT-DOASDOAS UnitDOAS-2F2FRecovery wheel trip alarmDIAuxiliary ContactEquipment SupplierDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0117VENT-DOASDOAS UnitDOAS-2F2FSupply fan motor statusDIAuxiliary ContactEquipment SupplierDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0118VENT-DOASDOAS UnitDOAS-2F2FSupply fan trip alarmDIAuxiliary ContactEquipment SupplierDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0119VENT-DOASDOAS UnitDOAS-2F2FSupply fan VFD speed commandAOVFD analog inputEquipment SupplierDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0120VENT-DOASDOAS UnitDOAS-2F2FSupply fan VFD speed feedbackAIVFD analog outputEquipment SupplierDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0121VENT-DOASDOAS UnitDOAS-2F2FExhaust fan motor statusDIAuxiliary ContactEquipment SupplierDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0122VENT-DOASDOAS UnitDOAS-2F2FExhaust fan trip alarmDIAuxiliary ContactEquipment SupplierDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0123VENT-DOASDOAS UnitDOAS-2F2FExhaust fan VFD speed commandAOVFD analog inputEquipment SupplierDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0124VENT-DOASDOAS UnitDOAS-2F2FExhaust fan VFD speed feedbackAIVFD analog outputEquipment SupplierDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0125VENT-DOASDOAS UnitDOAS-2F2FOA motorized damper statusDIDamper Position SwitchME ContractorDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0126VENT-DOASDOAS UnitDOAS-2F2FOA motorized damper commandAODamper ActuatorME ContractorDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0127VENT-DOASDOAS UnitDOAS-2F2FCHWS coil valve statusDIPosition FeedbackME ContractorDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0128VENT-DOASDOAS UnitDOAS-2F2FCHWS coil valve commandAOElectric Valve ActuatorME ContractorDoO: DOASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0129VENT-PAHUPrecooled Air Handling UnitPAHU-RDRoofdeckOA temperatureAITemperature SensorBMS ContractorDoO: PAHUPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0130VENT-PAHUPrecooled Air Handling UnitPAHU-RDRoofdeckOA flowAIFlow SensorBMS ContractorDoO: PAHUPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0131VENT-PAHUPrecooled Air Handling UnitPAHU-RDRoofdeckSupply TAITemperature SensorBMS ContractorDoO: PAHUPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0132VENT-PAHUPrecooled Air Handling UnitPAHU-RDRoofdeckFan motor statusDIAuxiliary ContactEquipment SupplierDoO: PAHUPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0133VENT-PAHUPrecooled Air Handling UnitPAHU-RDRoofdeckFan trip alarmDIAuxiliary ContactEquipment SupplierDoO: PAHUPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0134VENT-PAHUPrecooled Air Handling UnitPAHU-RDRoofdeckFan VFD speed commandAOVFD analog inputEquipment SupplierDoO: PAHUPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0135VENT-PAHUPrecooled Air Handling UnitPAHU-RDRoofdeckFan VFD speed feedbackAIVFD analog outputEquipment SupplierDoO: PAHUPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0136VENT-PAHUPrecooled Air Handling UnitPAHU-RDRoofdeckOA damper commandAODamper ActuatorEquipment SupplierDoO: PAHUPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0137VENT-PAHUPrecooled Air Handling UnitPAHU-RDRoofdeckCHWS valve commandAOElectric Valve ActuatorME ContractorDoO: PAHUPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0138VENT-PAHUPrecooled Air Handling UnitPAHU-RDRoofdeckCHWS valve statusDIPosition FeedbackME ContractorDoO: PAHUPNL-RDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0139VENT-AHUAHU (Chilled-Water-Served)AHU-LOBBY-GFGFReturn Air TAITemperature SensorBMS ContractorDoO: AHUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0140VENT-AHUAHU (Chilled-Water-Served)AHU-LOBBY-GFGFReturn Air RHAIHumidity SensorBMS ContractorDoO: AHUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0141VENT-AHUAHU (Chilled-Water-Served)AHU-LOBBY-GFGFSupply Air TAITemperature SensorBMS ContractorDoO: AHUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0142VENT-AHUAHU (Chilled-Water-Served)AHU-LOBBY-GFGFReturn CO2AICO2 SensorBMS ContractorDoO: AHUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0143VENT-AHUAHU (Chilled-Water-Served)AHU-LOBBY-GFGFFan motor statusDIAuxiliary ContactEquipment SupplierDoO: AHUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0144VENT-AHUAHU (Chilled-Water-Served)AHU-LOBBY-GFGFFan trip alarmDIAuxiliary ContactEquipment SupplierDoO: AHUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0145VENT-AHUAHU (Chilled-Water-Served)AHU-LOBBY-GFGFFan VFD speed commandAOVFD analog inputEquipment SupplierDoO: AHUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0146VENT-AHUAHU (Chilled-Water-Served)AHU-LOBBY-GFGFFan VFD speed feedbackAIVFD analog outputEquipment SupplierDoO: AHUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0147VENT-AHUAHU (Chilled-Water-Served)AHU-LOBBY-GFGFCHWS valve commandAOElectric Valve ActuatorME ContractorDoO: AHUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0148VENT-AHUAHU (Chilled-Water-Served)AHU-LOBBY-GFGFCHWS valve statusDIPosition FeedbackME ContractorDoO: AHUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0149VENT-AHUAHU (Chilled-Water-Served)AHU-LOBBY-GFGFOA damper commandAODamper ActuatorME ContractorDoO: AHUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0150VENT-AHUAHU (Chilled-Water-Served)AHU-LOBBY-GFGFRA damper commandAODamper ActuatorME ContractorDoO: AHUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0151VENT-AHUAHU (Chilled-Water-Served)AHU-BALL-2F2FReturn Air TAITemperature SensorBMS ContractorDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0152VENT-AHUAHU (Chilled-Water-Served)AHU-BALL-2F2FReturn Air RHAIHumidity SensorBMS ContractorDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0153VENT-AHUAHU (Chilled-Water-Served)AHU-BALL-2F2FSupply Air TAITemperature SensorBMS ContractorDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0154VENT-AHUAHU (Chilled-Water-Served)AHU-BALL-2F2FReturn CO2AICO2 SensorBMS ContractorDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0155VENT-AHUAHU (Chilled-Water-Served)AHU-BALL-2F2FFan motor statusDIAuxiliary ContactEquipment SupplierDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0156VENT-AHUAHU (Chilled-Water-Served)AHU-BALL-2F2FFan trip alarmDIAuxiliary ContactEquipment SupplierDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0157VENT-AHUAHU (Chilled-Water-Served)AHU-BALL-2F2FFan VFD speed commandAOVFD analog inputEquipment SupplierDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0158VENT-AHUAHU (Chilled-Water-Served)AHU-BALL-2F2FFan VFD speed feedbackAIVFD analog outputEquipment SupplierDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0159VENT-AHUAHU (Chilled-Water-Served)AHU-BALL-2F2FCHWS valve commandAOElectric Valve ActuatorME ContractorDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0160VENT-AHUAHU (Chilled-Water-Served)AHU-BALL-2F2FCHWS valve statusDIPosition FeedbackME ContractorDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0161VENT-AHUAHU (Chilled-Water-Served)AHU-BALL-2F2FOA damper commandAODamper ActuatorME ContractorDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0162VENT-AHUAHU (Chilled-Water-Served)AHU-BALL-2F2FRA damper commandAODamper ActuatorME ContractorDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0163VENT-AHUAHU (Chilled-Water-Served)AHU-REST-2F2FReturn Air TAITemperature SensorBMS ContractorDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0164VENT-AHUAHU (Chilled-Water-Served)AHU-REST-2F2FReturn Air RHAIHumidity SensorBMS ContractorDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0165VENT-AHUAHU (Chilled-Water-Served)AHU-REST-2F2FSupply Air TAITemperature SensorBMS ContractorDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0166VENT-AHUAHU (Chilled-Water-Served)AHU-REST-2F2FReturn CO2AICO2 SensorBMS ContractorDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0167VENT-AHUAHU (Chilled-Water-Served)AHU-REST-2F2FFan motor statusDIAuxiliary ContactEquipment SupplierDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0168VENT-AHUAHU (Chilled-Water-Served)AHU-REST-2F2FFan trip alarmDIAuxiliary ContactEquipment SupplierDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0169VENT-AHUAHU (Chilled-Water-Served)AHU-REST-2F2FFan VFD speed commandAOVFD analog inputEquipment SupplierDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0170VENT-AHUAHU (Chilled-Water-Served)AHU-REST-2F2FFan VFD speed feedbackAIVFD analog outputEquipment SupplierDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0171VENT-AHUAHU (Chilled-Water-Served)AHU-REST-2F2FCHWS valve commandAOElectric Valve ActuatorME ContractorDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0172VENT-AHUAHU (Chilled-Water-Served)AHU-REST-2F2FCHWS valve statusDIPosition FeedbackME ContractorDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0173VENT-AHUAHU (Chilled-Water-Served)AHU-REST-2F2FOA damper commandAODamper ActuatorME ContractorDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0174VENT-AHUAHU (Chilled-Water-Served)AHU-REST-2F2FRA damper commandAODamper ActuatorME ContractorDoO: AHUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0175VENT-AHUAHU (Chilled-Water-Served)AHU-AMEN-3F3FReturn Air TAITemperature SensorBMS ContractorDoO: AHUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0176VENT-AHUAHU (Chilled-Water-Served)AHU-AMEN-3F3FReturn Air RHAIHumidity SensorBMS ContractorDoO: AHUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0177VENT-AHUAHU (Chilled-Water-Served)AHU-AMEN-3F3FSupply Air TAITemperature SensorBMS ContractorDoO: AHUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0178VENT-AHUAHU (Chilled-Water-Served)AHU-AMEN-3F3FReturn CO2AICO2 SensorBMS ContractorDoO: AHUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0179VENT-AHUAHU (Chilled-Water-Served)AHU-AMEN-3F3FFan motor statusDIAuxiliary ContactEquipment SupplierDoO: AHUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0180VENT-AHUAHU (Chilled-Water-Served)AHU-AMEN-3F3FFan trip alarmDIAuxiliary ContactEquipment SupplierDoO: AHUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0181VENT-AHUAHU (Chilled-Water-Served)AHU-AMEN-3F3FFan VFD speed commandAOVFD analog inputEquipment SupplierDoO: AHUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0182VENT-AHUAHU (Chilled-Water-Served)AHU-AMEN-3F3FFan VFD speed feedbackAIVFD analog outputEquipment SupplierDoO: AHUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0183VENT-AHUAHU (Chilled-Water-Served)AHU-AMEN-3F3FCHWS valve commandAOElectric Valve ActuatorME ContractorDoO: AHUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0184VENT-AHUAHU (Chilled-Water-Served)AHU-AMEN-3F3FCHWS valve statusDIPosition FeedbackME ContractorDoO: AHUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0185VENT-AHUAHU (Chilled-Water-Served)AHU-AMEN-3F3FOA damper commandAODamper ActuatorME ContractorDoO: AHUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0186VENT-AHUAHU (Chilled-Water-Served)AHU-AMEN-3F3FRA damper commandAODamper ActuatorME ContractorDoO: AHUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0187VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-2F2FReturn Air TAITemperature SensorBMS ContractorDoO: AHUPNL-BOH-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0188VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-2F2FReturn Air RHAIHumidity SensorBMS ContractorDoO: AHUPNL-BOH-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0189VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-2F2FSupply Air TAITemperature SensorBMS ContractorDoO: AHUPNL-BOH-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0190VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-2F2FReturn CO2AICO2 SensorBMS ContractorDoO: AHUPNL-BOH-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0191VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-2F2FFan motor statusDIAuxiliary ContactEquipment SupplierDoO: AHUPNL-BOH-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0192VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-2F2FFan trip alarmDIAuxiliary ContactEquipment SupplierDoO: AHUPNL-BOH-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0193VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-2F2FFan VFD speed commandAOVFD analog inputEquipment SupplierDoO: AHUPNL-BOH-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0194VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-2F2FFan VFD speed feedbackAIVFD analog outputEquipment SupplierDoO: AHUPNL-BOH-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0195VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-2F2FCHWS valve commandAOElectric Valve ActuatorME ContractorDoO: AHUPNL-BOH-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0196VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-2F2FCHWS valve statusDIPosition FeedbackME ContractorDoO: AHUPNL-BOH-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0197VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-2F2FOA damper commandAODamper ActuatorME ContractorDoO: AHUPNL-BOH-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0198VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-2F2FRA damper commandAODamper ActuatorME ContractorDoO: AHUPNL-BOH-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0199VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-BSMTBasementReturn Air TAITemperature SensorBMS ContractorDoO: AHUPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0200VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-BSMTBasementReturn Air RHAIHumidity SensorBMS ContractorDoO: AHUPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0201VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-BSMTBasementSupply Air TAITemperature SensorBMS ContractorDoO: AHUPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0202VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-BSMTBasementReturn CO2AICO2 SensorBMS ContractorDoO: AHUPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0203VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-BSMTBasementFan motor statusDIAuxiliary ContactEquipment SupplierDoO: AHUPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0204VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-BSMTBasementFan trip alarmDIAuxiliary ContactEquipment SupplierDoO: AHUPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0205VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-BSMTBasementFan VFD speed commandAOVFD analog inputEquipment SupplierDoO: AHUPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0206VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-BSMTBasementFan VFD speed feedbackAIVFD analog outputEquipment SupplierDoO: AHUPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0207VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-BSMTBasementCHWS valve commandAOElectric Valve ActuatorME ContractorDoO: AHUPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0208VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-BSMTBasementCHWS valve statusDIPosition FeedbackME ContractorDoO: AHUPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0209VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-BSMTBasementOA damper commandAODamper ActuatorME ContractorDoO: AHUPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0210VENT-AHUAHU (Chilled-Water-Served)AHU-BOH-BSMTBasementRA damper commandAODamper ActuatorME ContractorDoO: AHUPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0211VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.013FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0212VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.013FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0213VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.013FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0214VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.023FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0215VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.023FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0216VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.023FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0217VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.033FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0218VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.033FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0219VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.033FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0220VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.043FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0221VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.043FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0222VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.043FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0223VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.053FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0224VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.053FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0225VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.053FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0226VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.063FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0227VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.063FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0228VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.063FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0229VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.073FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0230VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.073FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0231VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.073FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0232VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.083FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0233VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.083FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0234VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.083FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0235VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.093FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0236VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.093FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0237VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.093FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0238VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.103FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0239VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.103FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0240VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.103FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0241VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.113FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0242VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.113FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0243VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.113FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0244VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.123FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0245VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.123FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0246VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.123FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0247VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.133FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0248VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.133FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0249VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.133FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0250VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.143FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0251VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.143FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0252VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.143FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0253VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.153FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0254VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.153FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0255VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.153FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0256VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.163FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0257VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.163FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0258VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.163FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0259VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.173FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0260VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.173FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0261VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.173FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0262VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.183FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0263VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.183FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0264VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.183FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0265VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.193FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0266VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.193FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0267VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.193FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0268VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.203FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0269VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.203FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0270VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.203FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0271VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.213FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0272VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.213FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0273VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.213FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0274VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.223FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0275VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.223FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0276VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.223FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0277VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.233FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0278VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.233FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0279VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.233FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0280VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.243FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0281VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.243FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0282VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.243FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0283VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.253FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0284VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.253FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0285VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.253FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0286VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.263FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0287VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.263FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0288VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.263FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0289VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.273FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0290VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.273FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0291VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.273FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0292VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.283FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0293VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.283FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0294VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.283FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0295VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.293FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0296VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.293FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0297VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.293FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0298VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.303FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0299VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.303FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0300VENT-FCUFCU (guestroom/zone, hardwired)FCU-3F.303FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0301VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.012FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0302VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.012FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0303VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.012FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0304VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.022FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0305VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.022FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0306VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.022FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0307VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.032FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0308VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.032FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0309VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.032FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0310VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.042FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0311VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.042FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0312VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.042FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0313VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.052FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0314VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.052FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0315VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.052FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0316VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.062FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0317VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.062FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0318VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.062FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0319VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.072FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0320VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.072FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0321VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.072FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0322VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.082FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0323VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.082FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0324VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.082FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0325VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.092FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0326VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.092FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0327VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.092FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0328VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.102FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0329VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.102FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0330VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.102FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0331VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.112FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0332VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.112FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0333VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.112FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0334VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.122FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0335VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.122FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0336VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.122FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0337VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.132FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0338VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.132FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0339VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.132FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0340VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.142FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0341VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.142FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0342VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.142FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0343VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.152FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0344VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.152FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0345VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.152FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0346VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.162FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0347VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.162FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0348VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.162FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0349VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.172FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0350VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.172FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0351VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.172FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0352VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.182FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0353VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.182FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0354VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.182FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0355VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.192FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0356VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.192FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0357VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.192FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0358VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.202FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0359VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.202FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0360VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.202FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0361VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.212FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0362VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.212FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0363VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.212FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0364VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.222FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0365VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.222FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0366VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.222FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0367VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.232FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0368VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.232FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0369VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.232FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0370VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.242FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0371VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.242FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0372VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.242FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0373VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.252FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0374VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.252FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0375VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.252FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0376VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.262FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0377VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.262FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0378VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.262FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0379VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.272FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0380VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.272FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0381VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.272FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0382VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.282FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0383VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.282FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0384VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.282FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0385VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.292FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0386VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.292FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0387VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.292FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0388VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.302FFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0389VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.302FFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0390VENT-FCUFCU (guestroom/zone, hardwired)FCU-2F.302FCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0391VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.01GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0392VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.01GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0393VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.01GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0394VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.02GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0395VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.02GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0396VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.02GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0397VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.03GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0398VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.03GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0399VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.03GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0400VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.04GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0401VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.04GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0402VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.04GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0403VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.05GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0404VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.05GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0405VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.05GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0406VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.06GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0407VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.06GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0408VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.06GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0409VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.07GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0410VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.07GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0411VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.07GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0412VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.08GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0413VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.08GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0414VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.08GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0415VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.09GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0416VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.09GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0417VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.09GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0418VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.10GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0419VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.10GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0420VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.10GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0421VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.11GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0422VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.11GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0423VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.11GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0424VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.12GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0425VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.12GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0426VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.12GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0427VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.13GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0428VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.13GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0429VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.13GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0430VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.14GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0431VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.14GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0432VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.14GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0433VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.15GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0434VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.15GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0435VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.15GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0436VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.16GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0437VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.16GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0438VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.16GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0439VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.17GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0440VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.17GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0441VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.17GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0442VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.18GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0443VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.18GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0444VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.18GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0445VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.19GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0446VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.19GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0447VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.19GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0448VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.20GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0449VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.20GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0450VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.20GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0451VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.21GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0452VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.21GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0453VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.21GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0454VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.22GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0455VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.22GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0456VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.22GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0457VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.23GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0458VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.23GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0459VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.23GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0460VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.24GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0461VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.24GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0462VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.24GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0463VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.25GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0464VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.25GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0465VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.25GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0466VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.26GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0467VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.26GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0468VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.26GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0469VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.27GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0470VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.27GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0471VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.27GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0472VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.28GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0473VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.28GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0474VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.28GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0475VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.29GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0476VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.29GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0477VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.29GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0478VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.30GFFan statusDIAuxiliary ContactEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0479VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.30GFFan commandDORelay OutputEquipment SupplierDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0480VENT-FCUFCU (guestroom/zone, hardwired)FCU-GF.30GFCHWS valve command (3-position)DOValve ActuatorME ContractorDoO: FCUPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0481VENT-EASExhaust Fan (General)EAS-GFGFFan statusDIAuxiliary ContactEquipment SupplierDoO: EASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0482VENT-EASExhaust Fan (General)EAS-GFGFFan HOADIAuxiliary ContactEquipment SupplierDoO: EASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0483VENT-EASExhaust Fan (General)EAS-GFGFFan tripDIAuxiliary ContactEquipment SupplierDoO: EASPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0484VENT-EASExhaust Fan (General)EAS-2F2FFan statusDIAuxiliary ContactEquipment SupplierDoO: EASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0485VENT-EASExhaust Fan (General)EAS-2F2FFan HOADIAuxiliary ContactEquipment SupplierDoO: EASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0486VENT-EASExhaust Fan (General)EAS-2F2FFan tripDIAuxiliary ContactEquipment SupplierDoO: EASPNL-2FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0487VENT-EASExhaust Fan (General)EAS-3F3FFan statusDIAuxiliary ContactEquipment SupplierDoO: EASPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0488VENT-EASExhaust Fan (General)EAS-3F3FFan HOADIAuxiliary ContactEquipment SupplierDoO: EASPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0489VENT-EASExhaust Fan (General)EAS-3F3FFan tripDIAuxiliary ContactEquipment SupplierDoO: EASPNL-3FMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0490VENT-EASExhaust Fan (General)EAS-BSMTBasementFan statusDIAuxiliary ContactEquipment SupplierDoO: EASPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0491VENT-EASExhaust Fan (General)EAS-BSMTBasementFan HOADIAuxiliary ContactEquipment SupplierDoO: EASPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0492VENT-EASExhaust Fan (General)EAS-BSMTBasementFan tripDIAuxiliary ContactEquipment SupplierDoO: EASPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0493PL-CalorifiersCalorifier (Hot Water Storage Tank)CAL-1Plant RoomTank temperatureAITemperature SensorBMS ContractorDoO: CalorifierPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0494PL-CalorifiersCalorifier (Hot Water Storage Tank)CAL-2Plant RoomTank temperatureAITemperature SensorBMS ContractorDoO: CalorifierPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0495PL-CalorifiersCalorifier (Hot Water Storage Tank)CAL-3Plant RoomTank temperatureAITemperature SensorBMS ContractorDoO: CalorifierPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0496PL-CalorifiersCalorifier (Hot Water Storage Tank)CAL-4Plant RoomTank temperatureAITemperature SensorBMS ContractorDoO: CalorifierPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0497PL-CalorifiersCalorifier (Hot Water Storage Tank)CAL-5Plant RoomTank temperatureAITemperature SensorBMS ContractorDoO: CalorifierPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0498PL-CalorifiersCalorifier (Hot Water Storage Tank)CAL-6Plant RoomTank temperatureAITemperature SensorBMS ContractorDoO: CalorifierPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0499PL-HotWaterHot Water Header SetHDR-HWPlant RoomHW Supply Header TAITemperature SensorBMS ContractorDoO: HWPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0500PL-HotWaterHot Water Header SetHDR-HWPlant RoomHW Return Header TAITemperature SensorBMS ContractorDoO: HWPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0501PL-HotWaterHot Water Header SetHDR-HWPlant RoomMake-up Cold Water TAITemperature SensorBMS ContractorDoO: HWPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0502PL-HotWaterHot Water Header SetHDR-HWPlant RoomMUCW pressureAISensorBMS ContractorDoO: HWPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0503PL-HotWaterHot Water Header SetHDR-HWPlant RoomHW circulating flowAISensorBMS ContractorDoO: HWPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0504PL-HotWaterHot Water Header SetHDR-HWPlant RoomHW return TAITemperature SensorBMS ContractorDoO: HWPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0505PL-HeatPumpsHeat PumpHP-1Plant RoomPump motor statusDIAuxiliary ContactEquipment SupplierDoO: HPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0506PL-HeatPumpsHeat PumpHP-1Plant RoomPump HOADIAuxiliary ContactEquipment SupplierDoO: HPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0507PL-HeatPumpsHeat PumpHP-1Plant RoomPump tripDIAuxiliary ContactEquipment SupplierDoO: HPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0508PL-HeatPumpsHeat PumpHP-2Plant RoomPump motor statusDIAuxiliary ContactEquipment SupplierDoO: HPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0509PL-HeatPumpsHeat PumpHP-2Plant RoomPump HOADIAuxiliary ContactEquipment SupplierDoO: HPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0510PL-HeatPumpsHeat PumpHP-2Plant RoomPump tripDIAuxiliary ContactEquipment SupplierDoO: HPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0511PL-HeatPumpsHeat PumpHP-3Plant RoomPump motor statusDIAuxiliary ContactEquipment SupplierDoO: HPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0512PL-HeatPumpsHeat PumpHP-3Plant RoomPump HOADIAuxiliary ContactEquipment SupplierDoO: HPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0513PL-HeatPumpsHeat PumpHP-3Plant RoomPump tripDIAuxiliary ContactEquipment SupplierDoO: HPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0514PL-RecircPumpsRecirculating PumpRP-1Plant RoomPump statusDIAuxiliary ContactEquipment SupplierDoO: RPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0515PL-RecircPumpsRecirculating PumpRP-1Plant RoomPump tripDIAuxiliary ContactEquipment SupplierDoO: RPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0516PL-RecircPumpsRecirculating PumpRP-2Plant RoomPump statusDIAuxiliary ContactEquipment SupplierDoO: RPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0517PL-RecircPumpsRecirculating PumpRP-2Plant RoomPump tripDIAuxiliary ContactEquipment SupplierDoO: RPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0518PL-RecircPumpsRecirculating PumpRP-3Plant RoomPump statusDIAuxiliary ContactEquipment SupplierDoO: RPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0519PL-RecircPumpsRecirculating PumpRP-3Plant RoomPump tripDIAuxiliary ContactEquipment SupplierDoO: RPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0520PL-RecircPumpsRecirculating PumpRP-4Plant RoomPump statusDIAuxiliary ContactEquipment SupplierDoO: RPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0521PL-RecircPumpsRecirculating PumpRP-4Plant RoomPump tripDIAuxiliary ContactEquipment SupplierDoO: RPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0522PL-RecircPumpsRecirculating PumpRP-5Plant RoomPump statusDIAuxiliary ContactEquipment SupplierDoO: RPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0523PL-RecircPumpsRecirculating PumpRP-5Plant RoomPump tripDIAuxiliary ContactEquipment SupplierDoO: RPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0524PL-RecircPumpsRecirculating PumpRP-6Plant RoomPump statusDIAuxiliary ContactEquipment SupplierDoO: RPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0525PL-RecircPumpsRecirculating PumpRP-6Plant RoomPump tripDIAuxiliary ContactEquipment SupplierDoO: RPPNL-CHPLANT-GNDMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0526PL-BoilerSteam BoilerSB-1BasementSteam pressureAISteam Pressure Sensor (high-T)BMS ContractorDoO: BoilerPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0527PL-BoilerSteam BoilerSB-1BasementFeedwater temperatureAITemperature SensorBMS ContractorDoO: BoilerPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0528PL-BoilerSteam BoilerSB-1BasementFluegas temperatureAIHigh-Temperature SensorBMS ContractorDoO: BoilerPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0529PL-BoilerSteam BoilerSB-1BasementFluegas O2AIZirconia O2 SensorBMS ContractorDoO: BoilerPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0530PL-BoilerSteam BoilerSB-1BasementBlowdown valve commandAOMotorized Blowdown ValveBMS ContractorDoO: BoilerPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0531PL-BoilerSteam BoilerSB-1BasementBurner statusDIAuxiliary ContactEquipment SupplierDoO: BoilerPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0532PL-BoilerSteam BoilerSB-1BasementBurner tripDIAuxiliary ContactEquipment SupplierDoO: BoilerPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0533PL-BoilerSteam BoilerSB-1BasementHOA statusDIAuxiliary ContactEquipment SupplierDoO: BoilerPNL-BSMTMC Standards (ME/PL Points list) + project-specific equipment count per A-002
P0534Power-EEMultifunction Power Meter (Main)MTR-MAIN-1Main SwitchgearModbus HLI (V/I/kW/kWh/PF/THD per phase)HLIModbus Power MeterBMS ContractorEnergy reportingPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002Modbus RTU
P0535Power-EEMultifunction Power Meter (Main)MTR-MAIN-2Main SwitchgearModbus HLI (V/I/kW/kWh/PF/THD per phase)HLIModbus Power MeterBMS ContractorEnergy reportingPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002Modbus RTU
P0536Power-EEMultifunction Power Meter (Main)MTR-MAIN-3Main SwitchgearModbus HLI (V/I/kW/kWh/PF/THD per phase)HLIModbus Power MeterBMS ContractorEnergy reportingPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002Modbus RTU
P0537Power-EEMultifunction Power Meter (Feeder)MTR-FDR-01Sub-Distribution BoardModbus HLI (V/I/kW/kWh)HLIModbus Power MeterBMS ContractorEnergy reportingPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002Modbus RTU
P0538Power-EEMultifunction Power Meter (Feeder)MTR-FDR-02Sub-Distribution BoardModbus HLI (V/I/kW/kWh)HLIModbus Power MeterBMS ContractorEnergy reportingPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002Modbus RTU
P0539Power-EEMultifunction Power Meter (Feeder)MTR-FDR-03Sub-Distribution BoardModbus HLI (V/I/kW/kWh)HLIModbus Power MeterBMS ContractorEnergy reportingPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002Modbus RTU
P0540Power-EEMultifunction Power Meter (Feeder)MTR-FDR-04Sub-Distribution BoardModbus HLI (V/I/kW/kWh)HLIModbus Power MeterBMS ContractorEnergy reportingPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002Modbus RTU
P0541Power-EEMultifunction Power Meter (Feeder)MTR-FDR-05Sub-Distribution BoardModbus HLI (V/I/kW/kWh)HLIModbus Power MeterBMS ContractorEnergy reportingPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002Modbus RTU
P0542Power-EEMultifunction Power Meter (Feeder)MTR-FDR-06Sub-Distribution BoardModbus HLI (V/I/kW/kWh)HLIModbus Power MeterBMS ContractorEnergy reportingPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002Modbus RTU
P0543Power-EEMultifunction Power Meter (Feeder)MTR-FDR-07Sub-Distribution BoardModbus HLI (V/I/kW/kWh)HLIModbus Power MeterBMS ContractorEnergy reportingPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002Modbus RTU
P0544Power-EEMultifunction Power Meter (Feeder)MTR-FDR-08Sub-Distribution BoardModbus HLI (V/I/kW/kWh)HLIModbus Power MeterBMS ContractorEnergy reportingPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002Modbus RTU
P0545Power-EEMultifunction Power Meter (Feeder)MTR-FDR-09Sub-Distribution BoardModbus HLI (V/I/kW/kWh)HLIModbus Power MeterBMS ContractorEnergy reportingPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002Modbus RTU
P0546Power-EEMultifunction Power Meter (Feeder)MTR-FDR-10Sub-Distribution BoardModbus HLI (V/I/kW/kWh)HLIModbus Power MeterBMS ContractorEnergy reportingPNL-GFMC Standards (ME/PL Points list) + project-specific equipment count per A-002Modbus RTU
P0547NetworkBMS Network DropNET-PNL-RDpanelBACnet/IP drop at PNL-RDNetworkRJ45 + Cat6 to edge switchBMS ContractorDoO: NetworkPNL-RDA5 architecture
P0548NetworkBMS Network DropNET-PNL-3FpanelBACnet/IP drop at PNL-3FNetworkRJ45 + Cat6 to edge switchBMS ContractorDoO: NetworkPNL-3FA5 architecture
P0549NetworkBMS Network DropNET-PNL-2FpanelBACnet/IP drop at PNL-2FNetworkRJ45 + Cat6 to edge switchBMS ContractorDoO: NetworkPNL-2FA5 architecture
P0550NetworkBMS Network DropNET-PNL-GFpanelBACnet/IP drop at PNL-GFNetworkRJ45 + Cat6 to edge switchBMS ContractorDoO: NetworkPNL-GFA5 architecture
P0551NetworkBMS Network DropNET-PNL-BSMTpanelBACnet/IP drop at PNL-BSMTNetworkRJ45 + Cat6 to edge switchBMS ContractorDoO: NetworkPNL-BSMTA5 architecture
P0552NetworkBMS Network DropNET-PNL-CHPLANT-GNDpanelBACnet/IP drop at PNL-CHPLANT-GNDNetworkRJ45 + Cat6 to edge switchBMS ContractorDoO: NetworkPNL-CHPLANT-GNDA5 architecture
P0553NetworkBMS Network DropNET-PNL-BOH-2FpanelBACnet/IP drop at PNL-BOH-2FNetworkRJ45 + Cat6 to edge switchBMS ContractorDoO: NetworkPNL-BOH-2FA5 architecture
P0554NetworkBMS Network DropNET-PNL-HE-GFpanelBACnet/IP drop at PNL-HE-GFNetworkRJ45 + Cat6 to edge switchBMS ContractorDoO: NetworkPNL-HE-GFA5 architecture