Summary

A1 — I/O List, Audit View
ProjectKingsford Hotel Bacolod — BMS (AB-Run-2)
Canonical sourceA1-io-list.yaml
How to record correctionsEdit the canonical YAML directly — add a verification: block to the affected row(s)
Totals
Total I/O points474
Unique equipment instances59
Systems represented9
Verification status
StatusCount% of total
verified00%
needs_correction00%
uncertain00%
unverified474100%
⚠ Known weak points
Equipment quantities are derived from the customer's points list. Cross-verify against mechanical floor plans (Q-008) and architectural plans (Q-005). Where the points list shows aggregate counts without per-tag enumeration, the gap is captured as Q-021.
How corrections flow
Edit A1-io-list.yaml — add a verification: block to any row where you confirm or correct the equipment, location, or panel assignment.
Re-run the deliverables generator to refresh downstream artifacts.

By System

SystemEquipment instancesI/O points
Chilled Water Plant990
Exhaust927
Power Monitoring948
Hot Water820
Condenser Water Loop734
Ventilation6108
Air Conditioning684
Casino Air Conditioning331
Boiler232
TOTAL59474

By Location

LocationEquipment instances
2F Chiller Plant Room13
Roofdeck DOAS7
2F Common Public7
Lower Ground Calorifier Room6
Roofdeck Cooling Tower5
Ground Floor Lobby4
Ground Floor Casino4
Lower Ground Boiler Room4
Basement BOH3
3F Amenity3
Ground Floor Restaurant1
Ground Floor Casino Lobby1
Lower Ground Main Switchgear1

By Panel

PanelEquipment instances
PNL-CH-PLANT-2F13
PNL-AIR-ROOF7
PNL-AIR-2F7
PNL-PL-LG7
PNL-CT-ROOF5
PNL-AIR-GF5
PNL-CASINO-GF5
PNL-AIR-BSMT3
PNL-AIR-3F3
PNL-BLR-LG3
PNL-PM-LG1

Verification schema

How to record verification / corrections in A1-io-list.yaml
Find the affected row in the YAML by ID (Detail sheet column A) and add a verification: block:
- id: chws.ch-1.entering-chw-temp
verification: # ADDED by team
status: needs_correction # unverified | verified | needs_correction | uncertain
verified_by: J. Cruz
verified_date: 2026-05-10
drawing_ref: "EE-09 grid B-2"
notes: ""
After saving, re-run: python3 _playbook/tools/generate-deliverables.py <project>
Corrections propagate to B4 manhours, BOQ, and final deliverables automatically.
Recommended verification methods (priority order):
1. Site walkthrough with measurement (most accurate; for cable lengths, after structural completion).
2. Properly-scaled architectural drawings.
3. Mechanical contractor's tray layout combined with BMS panel locations.
4. A-001 default with ±20% contingency in BOQ — last resort.