# A4 — Panel Schedule
# Generated from A1-io-list.yaml
#
metadata:
  project: "Kingsford Hotel Bacolod \u2014 BMS"
  generated_from: A1-io-list.yaml
  generator: _playbook/tools/generate-a4-panel-schedule.py
  controller_sizing_rule: 1 DDC controller per 40 physical I/O, +1 network gateway if Network drops present. Refine after Q-008 confirms wiring topology.
  power_estimate_basis: ~25W per controller, ~5W per network device. Excludes UPS/transformer overhead.
summary:
  total_panels: 8
  total_physical_io: 561
  total_hli_subpoints: 141
  total_network_drops: 42
  total_io_points: 744
  total_controllers_estimated: 19
  total_power_watts_estimated: 685
  panel_summary_table:
  - panel: DDC-2F-BOH
    location: 2nd Floor / 2nd Floor BOH / 2nd Floor BOH Toilet / 2nd Floor General Service / 2nd Floor OHR / 2nd Floor Toilet / 2nd Level AHU MCC / 2nd Level BOH / 2nd Level Executive Lounge / 2nd Level
      Function Room 2 / 2nd Level Function Room 3 / 2nd Level Function Rooms / 2nd Level Pre-Function
    physical_io: 165
    network: 13
    controllers: 5
    power_w: 190
    equipment_count: 25
  - panel: DDC-2F-CHILLER
    location: 2nd Level Chiller MCC / 2nd Level Chiller Room
    physical_io: 72
    network: 9
    controllers: 2
    power_w: 95
    equipment_count: 16
  - panel: DDC-2M-CASINO
    location: 2nd Mezzanine (Casino)
    physical_io: 47
    network: 5
    controllers: 2
    power_w: 75
    equipment_count: 5
  - panel: DDC-3F
    location: 3rd Floor / 3rd Floor Amenity Toilet / 3rd Floor BOH / 3rd Floor Toilet
    physical_io: 36
    network: 0
    controllers: 1
    power_w: 25
    equipment_count: 12
  - panel: DDC-B1-BOH
    location: Basement / Basement Battery Room / Basement FOST Room / Basement Garbage Lobby / Basement Main Fire Riser / Basement Mech / Pump / Basement Pump Room / Basement Service / Basement Toilet /
      Basement Wash Service
    physical_io: 57
    network: 1
    controllers: 2
    power_w: 55
    equipment_count: 17
  - panel: DDC-GF-BOH
    location: GF Main Lobby Toilet / Ground Floor AHU MCC / Ground Floor BOH / Ground Floor Fire Command Center
    physical_io: 48
    network: 5
    controllers: 2
    power_w: 75
    equipment_count: 9
  - panel: DDC-LG-PLANT
    location: Lower Ground Boiler Room / Lower Ground HWL Room / Lower Ground Lighting Panel A / Lower Ground Lighting Panel B / Lower Ground Main Switchroom
    physical_io: 26
    network: 5
    controllers: 2
    power_w: 75
    equipment_count: 9
  - panel: DDC-RD-PLANT
    location: Roof Deck / Roof Deck CT Area / Roof Deck HWL Area
    physical_io: 110
    network: 4
    controllers: 3
    power_w: 95
    equipment_count: 16
panels:
- id: DDC-2F-BOH
  location: 2nd Floor / 2nd Floor BOH / 2nd Floor BOH Toilet / 2nd Floor General Service / 2nd Floor OHR / 2nd Floor Toilet / 2nd Level AHU MCC / 2nd Level BOH / 2nd Level Executive Lounge / 2nd Level Function
    Room 2 / 2nd Level Function Room 3 / 2nd Level Function Rooms / 2nd Level Pre-Function
  system_scope:
  - AC
  - EL
  - VENT
  equipment_served:
    instance_count: 25
    instances:
    - AHU-B.1
    - AHU-B.2
    - AHU-B.3
    - AHU-EL
    - AHU-FR2
    - AHU-FR3
    - AHU-PF
    - EF-2.1
    - EF-2.2
    - EF-2.3
    - EF-2.4
    - EF-2B.1
    - EF-2B.2
    - EF-GS.1
    - EF-GS.2
    - EF-OHRv2
    - MPM-AHU-2F
    - PAHU-B.1
    - PAHU-B.2
    - PAHU-B.3
    - PAHU-FR
    - PAHU-PF
    - TEF-2.1
    - TEF-2.2
    - TEF-2B.3
    by_class:
      AHU (Chilled-Water-Served): 105
      Precooled Air Handling Unit: 60
      Exhaust Fan (General): 27
      Exhaust Fan (Toilet): 9
      Multifunction Power Meter (Feeder): 2
  io_summary:
    physical_io: 165
    hli_subpoints: 25
    network_drops: 13
    total: 203
    by_type:
      AI: 69
      AO: 31
      DI: 65
      HLI: 25
      Network: 13
    by_co:
      BMS Contractor: 52
      Equipment Supplier: 125
      ME Contractor: 26
  controller_estimate:
    ddc_controllers: 5
    network_gateway: 1
    total_controllers: 5
    rule: 1 DDC per 40 physical I/O, plus 1 network gateway if BACnet/Modbus integration on panel
  power_estimate_w: 190
  enclosure_assumption: Wall-mount IP54 metal cabinet, sized per controller count + 30% spare
  notes: ''
- id: DDC-2F-CHILLER
  location: 2nd Level Chiller MCC / 2nd Level Chiller Room
  system_scope:
  - AC
  - EL
  equipment_served:
    instance_count: 16
    instances:
    - CH-1
    - CH-2
    - CH-3
    - CHW-DIFF
    - CHW-RET-HDR
    - CHW-SUP-HDR
    - COWP-1
    - COWP-2
    - COWP-3
    - MPM-CHILLER
    - PCHWP-1
    - PCHWP-2
    - PCHWP-3
    - SCHWP-1
    - SCHWP-2
    - SCHWP-3
    by_class:
      Chiller (Package Water-Cooled): 84
      Secondary CHW Pump: 21
      Primary CHW Pump: 16
      Condenser Water Pump: 12
      Primary CHW Pump (Standby): 4
      CHW Bypass Header: 3
      CHW Supply Main Header: 2
      CHW Return Main Header: 2
      Multifunction Power Meter (Feeder): 2
  io_summary:
    physical_io: 72
    hli_subpoints: 65
    network_drops: 9
    total: 146
    by_type:
      AI: 29
      DI: 34
      DO: 9
      HLI: 65
      Network: 9
    by_co:
      BMS Contractor: 32
      Equipment Supplier: 108
      ME Contractor: 6
  controller_estimate:
    ddc_controllers: 2
    network_gateway: 1
    total_controllers: 2
    rule: 1 DDC per 40 physical I/O, plus 1 network gateway if BACnet/Modbus integration on panel
  power_estimate_w: 95
  enclosure_assumption: Wall-mount IP54 metal cabinet, sized per controller count + 30% spare
  notes: ''
- id: DDC-2M-CASINO
  location: 2nd Mezzanine (Casino)
  system_scope:
  - AC
  - VENT
  equipment_served:
    instance_count: 5
    instances:
    - AHU-2M.1
    - AHU-2M.2
    - AIR-ION-2M.1
    - AIR-ION-2M.2
    - DOAS-2M
    by_class:
      AHU (Chilled-Water-Served): 30
      "DOAS Unit (Casino \u2014 with CO/VOC)": 22
      Air Ionizer (Casino): 8
  io_summary:
    physical_io: 47
    hli_subpoints: 8
    network_drops: 5
    total: 60
    by_type:
      AI: 24
      AO: 8
      DI: 15
      HLI: 8
      Network: 5
    by_co:
      BMS Contractor: 17
      Equipment Supplier: 34
      ME Contractor: 9
  controller_estimate:
    ddc_controllers: 2
    network_gateway: 1
    total_controllers: 2
    rule: 1 DDC per 40 physical I/O, plus 1 network gateway if BACnet/Modbus integration on panel
  power_estimate_w: 75
  enclosure_assumption: Wall-mount IP54 metal cabinet, sized per controller count + 30% spare
  notes: ''
- id: DDC-3F
  location: 3rd Floor / 3rd Floor Amenity Toilet / 3rd Floor BOH / 3rd Floor Toilet
  system_scope:
  - VENT
  equipment_served:
    instance_count: 12
    instances:
    - EF-3.1
    - EF-3.2
    - EF-3.3
    - EF-3.4
    - EF-3B-G
    - EF-3C.1-G
    - TEF-30.20
    - TEF-3A.1
    - TEF-3A.2
    - TEF-3B
    - TEF-3C.1
    - TEF-3C.2
    by_class:
      Exhaust Fan (Toilet): 18
      Exhaust Fan (General): 18
  io_summary:
    physical_io: 36
    hli_subpoints: 0
    network_drops: 0
    total: 36
    by_type:
      DI: 36
    by_co:
      Equipment Supplier: 36
  controller_estimate:
    ddc_controllers: 1
    network_gateway: 0
    total_controllers: 1
    rule: 1 DDC per 40 physical I/O, plus 1 network gateway if BACnet/Modbus integration on panel
  power_estimate_w: 25
  enclosure_assumption: Wall-mount IP54 metal cabinet, sized per controller count + 30% spare
  notes: ''
- id: DDC-B1-BOH
  location: Basement / Basement Battery Room / Basement FOST Room / Basement Garbage Lobby / Basement Main Fire Riser / Basement Mech / Pump / Basement Pump Room / Basement Service / Basement Toilet / Basement
    Wash Service
  system_scope:
  - VENT
  equipment_served:
    instance_count: 17
    instances:
    - EF-B.1
    - EF-B.2
    - EF-BR.1
    - EF-BR.2
    - EF-BS.1
    - EF-BS.2
    - EF-FOST.1
    - EF-GL.1
    - EF-GL.2
    - EF-MFR.1
    - EF-MP.1
    - EF-PR.1
    - EF-PR.3
    - EF-WS.1
    - PAHU-0.1
    - TEF-B.1
    - TEF-B.2
    by_class:
      Exhaust Fan (General): 42
      Precooled Air Handling Unit: 12
      Exhaust Fan (Toilet): 6
  io_summary:
    physical_io: 57
    hli_subpoints: 2
    network_drops: 1
    total: 60
    by_type:
      AI: 4
      AO: 2
      DI: 51
      HLI: 2
      Network: 1
    by_co:
      BMS Contractor: 3
      Equipment Supplier: 56
      ME Contractor: 1
  controller_estimate:
    ddc_controllers: 2
    network_gateway: 1
    total_controllers: 2
    rule: 1 DDC per 40 physical I/O, plus 1 network gateway if BACnet/Modbus integration on panel
  power_estimate_w: 55
  enclosure_assumption: Wall-mount IP54 metal cabinet, sized per controller count + 30% spare
  notes: ''
- id: DDC-GF-BOH
  location: GF Main Lobby Toilet / Ground Floor AHU MCC / Ground Floor BOH / Ground Floor Fire Command Center
  system_scope:
  - AC
  - EL
  - FDAS
  - VENT
  equipment_served:
    instance_count: 9
    instances:
    - AHU-1.1
    - AHU-1.2
    - AHU-1.3
    - FACP-GW
    - MPM-AHU-GF
    - TEF-1.1
    - TEF-1.2
    - TEF-1.3
    - TEF-1.4
    by_class:
      AHU (Chilled-Water-Served): 45
      Exhaust Fan (Toilet): 12
      FACP Gateway: 4
      Multifunction Power Meter (Feeder): 2
  io_summary:
    physical_io: 48
    hli_subpoints: 10
    network_drops: 5
    total: 63
    by_type:
      AI: 21
      AO: 9
      DI: 18
      HLI: 10
      Network: 5
    by_co:
      BMS Contractor: 17
      EE Contractor: 4
      Equipment Supplier: 33
      ME Contractor: 9
  controller_estimate:
    ddc_controllers: 2
    network_gateway: 1
    total_controllers: 2
    rule: 1 DDC per 40 physical I/O, plus 1 network gateway if BACnet/Modbus integration on panel
  power_estimate_w: 75
  enclosure_assumption: Wall-mount IP54 metal cabinet, sized per controller count + 30% spare
  notes: ''
- id: DDC-LG-PLANT
  location: Lower Ground Boiler Room / Lower Ground HWL Room / Lower Ground Lighting Panel A / Lower Ground Lighting Panel B / Lower Ground Main Switchroom
  system_scope:
  - EL
  - HWL
  - VENT
  equipment_served:
    instance_count: 9
    instances:
    - HP-LZ
    - HWH-LZ
    - HWT-LZ
    - MPM-LIGHT-A
    - MPM-LIGHT-B
    - MPM-MAIN
    - RP-LZ
    - SB-1
    - SB-2
    by_class:
      Steam Boiler: 34
      Multifunction Power Meter (Feeder): 4
      Hot Water Header Set: 3
      Heat Pump: 3
      Recirculating Pump: 3
      Multifunction Power Meter (Main): 2
      Calorifier (Hot Water Storage Tank): 1
  io_summary:
    physical_io: 26
    hli_subpoints: 19
    network_drops: 5
    total: 50
    by_type:
      AI: 12
      DI: 12
      DO: 2
      HLI: 19
      Network: 5
    by_co:
      BMS Contractor: 22
      Equipment Supplier: 28
  controller_estimate:
    ddc_controllers: 1
    network_gateway: 1
    total_controllers: 2
    rule: 1 DDC per 40 physical I/O, plus 1 network gateway if BACnet/Modbus integration on panel
  power_estimate_w: 75
  enclosure_assumption: Wall-mount IP54 metal cabinet, sized per controller count + 30% spare
  notes: ''
- id: DDC-RD-PLANT
  location: Roof Deck / Roof Deck CT Area / Roof Deck HWL Area
  system_scope:
  - AC
  - HWL
  - VENT
  equipment_served:
    instance_count: 16
    instances:
    - CT-1
    - CT-2
    - CT-3
    - CT-COMMON
    - CW-HDR
    - DOAS-RD.1
    - DOAS-RD.2
    - EF-1
    - EF-RD.1
    - EF-RO.2
    - HP-HZ
    - HWH-HZ
    - HWT-HZ
    - PAHU-r.1
    - PAHU-r.2
    - RP-HZ
    by_class:
      DOAS Unit: 50
      Cooling Tower: 27
      Precooled Air Handling Unit: 24
      Exhaust Fan (General): 9
      Cooling Tower (Common): 4
      Hot Water Header Set: 3
      Heat Pump: 3
      Recirculating Pump: 3
      Condenser Water Header: 2
      Calorifier (Hot Water Storage Tank): 1
  io_summary:
    physical_io: 110
    hli_subpoints: 12
    network_drops: 4
    total: 126
    by_type:
      AI: 41
      AO: 8
      DI: 55
      DO: 6
      HLI: 12
      Network: 4
    by_co:
      BMS Contractor: 40
      Equipment Supplier: 70
      ME Contractor: 16
  controller_estimate:
    ddc_controllers: 3
    network_gateway: 1
    total_controllers: 3
    rule: 1 DDC per 40 physical I/O, plus 1 network gateway if BACnet/Modbus integration on panel
  power_estimate_w: 95
  enclosure_assumption: Wall-mount IP54 metal cabinet, sized per controller count + 30% spare
  notes: ''