# 5.3.2 — Integrated Test Boiler

**Module:** [bms/testing-commissioning](../../../_playbook/modules/bms/testing-commissioning.md)
**WBS leaf:** 5.3.2
**Project:** Kingsford Hotel Bacolod — BMS (AB-Run-6)
**Date:** 2026-04-28

### Project-specific values
- **Joint test:** ME contractor + Equipment Supplier (burner controller) + BMS.
- **Scope:** burner sequence, fuel-oil pump + waterfeed pump interlocks, fluegas O2 alarm thresholds, motorized-valve blowdown sequence.
- **References:** MC Standards ME boiler block, BMS-01 boiler-laundry table.
