# 5.1 — P2P Testing

**Module:** [bms/testing-commissioning](../../../_playbook/modules/bms/testing-commissioning.md)
**WBS leaf:** 5.1
**Project:** Kingsford Hotel Bacolod — BMS (AB-Run-6)
**Date:** 2026-04-28

### Project-specific values
- See 3.8 (Pre-functional P2P) — scope is identical at proposal level; production work is in 3.8 line; this leaf documents the formal P2P certificate package per Megaworld DRC-004 SAT workflow.
- **References:** B3, BMS-01 spec.