# 4.1 — Controller Programming

**Module:** [bms/programming-engineering](../../../_playbook/modules/bms/programming-engineering.md)
**WBS leaf:** 4.1
**Project:** Kingsford Hotel Bacolod — BMS (AB-Run-6)
**Date:** 2026-04-28

### Project-specific values
- **Programming objects:** 1352 per B1 (controller-level points + control loops + alarms + schedules + reports + trends).
- **Hours:** 233.9 hr per B1.
- **References:** B1, MC Standards ME / PL Description of Operations, BMS-03 control narratives.
