# 3.6 — Network Installation

**Module:** [bms/network-infrastructure](../../../_playbook/modules/bms/network-infrastructure.md)
**WBS leaf:** 3.6
**Project:** Kingsford Hotel Bacolod — BMS (AB-Run-6)
**Date:** 2026-04-28

### Project-specific values
- **Scope:** install core switch + 11 edge switches; pull + terminate fibre riser + Cat6 horizontal trunks; install head-end UPS + rack.
- **References:** A5, A6, B4.