# 3.5.2 — Field Device Install Plumbing

**Module:** [bms/field-devices-plumbing](../../../_playbook/modules/bms/field-devices-plumbing.md)
**WBS leaf:** 3.5.2
**Project:** Kingsford Hotel Bacolod — BMS (AB-Run-6)
**Date:** 2026-04-28

### Project-specific values
- **Scope:** install calorifier T-sensors (HWT-LZ, HWT-HZ); install hot-water header T-sensors (HWH-LZ, HWH-HZ); terminate pump auxiliary contacts at HP-LZ/HZ + RP-LZ/HZ.
- **References:** B4, A2, MC Standards PL.
