# 3.2 — Containment Installation

**Module:** [bms/cabling-and-containment](../../../_playbook/modules/bms/cabling-and-containment.md)
**WBS leaf:** 3.2
**Project:** Kingsford Hotel Bacolod — BMS (AB-Run-6)
**Date:** 2026-04-28

### Project-specific values
- **Scope:** EMT conduit 1,290 m (25% of cable per B4) + cable-tray accessories at panel-side and riser transitions.
- **Production rate (per B4):** see B4 conduit_install_per_m line.
- **Sequence:** plant rooms first, then risers, then BOH branches per D1 phase 5.
- **References:** B4, D1.