# 2.6.1 — Power Meters

**Module:** [bms/field-devices-power](../../../_playbook/modules/bms/field-devices-power.md)
**WBS leaf:** 2.6.1
**Project:** Kingsford Hotel Bacolod — BMS (AB-Run-6)
**Date:** 2026-04-28

### Project-specific values
- **Locations & quantity:** MPM-MAIN (1, Lower Ground main switchroom), MPM-CHILLER (1, 2nd Level Chiller MCC), MPM-AHU-2F (1, 2F AHU MCC), MPM-AHU-GF (1, GF AHU MCC), MPM-LIGHT-A/B (2, lighting feeders) = 6 meters.
- **CT installation:** stab-on or hot-tap per EE contractor coordination (C2 row 8).
- **Network:** Modbus TCP to DDC-LG-PLANT (gateway).
- **References:** A1 EL system, A-007 (Megaworld DRC-004 energy-submetering scope, pending Q-008).