# 2.5.1 — Plumbing Temperature Sensors

**Module:** [bms/field-devices-plumbing](../../../_playbook/modules/bms/field-devices-plumbing.md)
**WBS leaf:** 2.5.1
**Project:** Kingsford Hotel Bacolod — BMS (AB-Run-6)
**Date:** 2026-04-28

### Project-specific values
- **Locations:** calorifier tank temp (HWT-LZ + HWT-HZ); supply / return / makeup header T-sensors (HWH-LZ + HWH-HZ).
- **Quantity:** 2 calorifier T-sensors + 6 header T-sensors = 8 sensors.
- **References:** A1 (PL system), MC Standards PL.
