# 1.4 — Factory Acceptance Test

**Module:** [bms/testing-commissioning](../../../_playbook/modules/bms/testing-commissioning.md)
**WBS leaf:** 1.4
**Project:** Kingsford Hotel Bacolod — BMS (AB-Run-6)
**Date:** 2026-04-28

### Project-specific values
- **FAT scope:** head-end server + workstation full functional + sample DDC panel (DDC-2F-CHILLER) with sample I/O loadings.
- **Witness:** Megaworld FM team + RJ Calpo & Co. consultant.
- **References:** BMS-01 "Testing and Commissioning" spec; B3 commissioning point inventory.