metadata:
  project: Kingsford Hotel Bacolod — BMS
  date: '2026-04-28'
  source: BMS Points list (TUEC) BMS-01/02/03 + MC Standards ME/PL
  status: draft
  extraction_basis: Aggregate per-equipment-class rows expanded to one-point-per-row
    (point identifiers are positional, not source-stamped — Phase 5b module instances
    and downstream helpers care about counts per (panel, equipment, type), which this
    preserves)
io_list:
- id: P-00001
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #1 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Packaged water chiller; per-unit ~9 AI / 18 DI. HLI via BACnet typically;
    drawn here as discrete points. Includes leaving/entering CHW & CDW temps, oil
    sump temp/press, oil pump on/off, evap/cond approach ΔT/ΔP, refrigerant temp/press,
    compressor amp & on/off, motorized isolation valves sup/ret.
- id: P-00002
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #2 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00003
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #3 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00004
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #4 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00005
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #5 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00006
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #6 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00007
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #7 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00008
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #8 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00009
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #9 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00010
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #10 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00011
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #11 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00012
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #12 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00013
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #13 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00014
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #14 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00015
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #15 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00016
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #16 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00017
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #17 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00018
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #18 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00019
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #19 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00020
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #20 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00021
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #21 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00022
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #22 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00023
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #23 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00024
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #24 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00025
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #25 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00026
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #26 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00027
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #27 of 27 for CH-1 to CH-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00028
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #1 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Packaged water chiller; per-unit ~9 AI / 18 DI. HLI via BACnet typically;
    drawn here as discrete points. Includes leaving/entering CHW & CDW temps, oil
    sump temp/press, oil pump on/off, evap/cond approach ΔT/ΔP, refrigerant temp/press,
    compressor amp & on/off, motorized isolation valves sup/ret.
- id: P-00029
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #2 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00030
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #3 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00031
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #4 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00032
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #5 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00033
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #6 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00034
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #7 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00035
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #8 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00036
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #9 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00037
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #10 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00038
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #11 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00039
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #12 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00040
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #13 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00041
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #14 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00042
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #15 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00043
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #16 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00044
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #17 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00045
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #18 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00046
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #19 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00047
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #20 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00048
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #21 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00049
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #22 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00050
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #23 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00051
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #24 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00052
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #25 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00053
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #26 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00054
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #27 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00055
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #28 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00056
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #29 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00057
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #30 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00058
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #31 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00059
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #32 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00060
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #33 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00061
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #34 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00062
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #35 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00063
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #36 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00064
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #37 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00065
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #38 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00066
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #39 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00067
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #40 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00068
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #41 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00069
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #42 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00070
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #43 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00071
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #44 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00072
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #45 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00073
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #46 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00074
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #47 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00075
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #48 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00076
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #49 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00077
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #50 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00078
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #51 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00079
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #52 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00080
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #53 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00081
  system: Chilled Water Plant
  equipment_class: Chiller (Package Water-Cooled)
  equipment_instance: CH-1 to CH-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #54 of 54 for CH-1 to CH-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00082
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #1 of 18 for CHWP-1 to CHWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Primary chilled water pumps; start/stop, on/off, H/O/A, trip, supply flow
    status, VFD speed monitoring per BMS-04 P&ID (PCHWP shows AI 2/DI 1/DO 1/NETWORK
    1 per unit).
- id: P-00083
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #2 of 18 for CHWP-1 to CHWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00084
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #3 of 18 for CHWP-1 to CHWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00085
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #4 of 18 for CHWP-1 to CHWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00086
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #5 of 18 for CHWP-1 to CHWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00087
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #6 of 18 for CHWP-1 to CHWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00088
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #7 of 18 for CHWP-1 to CHWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00089
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #8 of 18 for CHWP-1 to CHWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00090
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #9 of 18 for CHWP-1 to CHWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00091
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #10 of 18 for CHWP-1 to CHWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00092
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #11 of 18 for CHWP-1 to CHWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00093
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #12 of 18 for CHWP-1 to CHWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00094
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #13 of 18 for CHWP-1 to CHWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00095
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #14 of 18 for CHWP-1 to CHWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00096
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #15 of 18 for CHWP-1 to CHWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00097
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #16 of 18 for CHWP-1 to CHWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00098
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #17 of 18 for CHWP-1 to CHWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00099
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #18 of 18 for CHWP-1 to CHWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00100
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DO
  point_description: 'DO point #1 of 3 for CHWP-1 to CHWP-3'
  field_device: Command relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Primary chilled water pumps; start/stop, on/off, H/O/A, trip, supply flow
    status, VFD speed monitoring per BMS-04 P&ID (PCHWP shows AI 2/DI 1/DO 1/NETWORK
    1 per unit).
- id: P-00101
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DO
  point_description: 'DO point #2 of 3 for CHWP-1 to CHWP-3'
  field_device: Command relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00102
  system: Chilled Water Plant
  equipment_class: Primary CHW Pump
  equipment_instance: CHWP-1 to CHWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DO
  point_description: 'DO point #3 of 3 for CHWP-1 to CHWP-3'
  field_device: Command relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00103
  system: Chilled Water Plant
  equipment_class: CHW Supply Main Header
  equipment_instance: CHW Supply & Return Main Header
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #1 of 6 for CHW Supply & Return Main Header'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: 1 supply + 1 return header at 2F. Temp, press, ΔP, ΔT; motorized isolation
    valve sup/ret status + ctrl.
- id: P-00104
  system: Chilled Water Plant
  equipment_class: CHW Supply Main Header
  equipment_instance: CHW Supply & Return Main Header
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #2 of 6 for CHW Supply & Return Main Header'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00105
  system: Chilled Water Plant
  equipment_class: CHW Supply Main Header
  equipment_instance: CHW Supply & Return Main Header
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #3 of 6 for CHW Supply & Return Main Header'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00106
  system: Chilled Water Plant
  equipment_class: CHW Supply Main Header
  equipment_instance: CHW Supply & Return Main Header
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #4 of 6 for CHW Supply & Return Main Header'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00107
  system: Chilled Water Plant
  equipment_class: CHW Supply Main Header
  equipment_instance: CHW Supply & Return Main Header
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #5 of 6 for CHW Supply & Return Main Header'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00108
  system: Chilled Water Plant
  equipment_class: CHW Supply Main Header
  equipment_instance: CHW Supply & Return Main Header
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AI
  point_description: 'AI point #6 of 6 for CHW Supply & Return Main Header'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00109
  system: Chilled Water Plant
  equipment_class: CHW Supply Main Header
  equipment_instance: CHW Supply & Return Main Header
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: AO
  point_description: 'AO point #1 of 1 for CHW Supply & Return Main Header'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: 1 supply + 1 return header at 2F. Temp, press, ΔP, ΔT; motorized isolation
    valve sup/ret status + ctrl.
- id: P-00110
  system: Chilled Water Plant
  equipment_class: Condenser Water Pump
  equipment_instance: CDWP-1 to CDWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #1 of 9 for CDWP-1 to CDWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Condenser water pumps; pump motor status, H/O/A, trip alarm; on/off control.
- id: P-00111
  system: Chilled Water Plant
  equipment_class: Condenser Water Pump
  equipment_instance: CDWP-1 to CDWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #2 of 9 for CDWP-1 to CDWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00112
  system: Chilled Water Plant
  equipment_class: Condenser Water Pump
  equipment_instance: CDWP-1 to CDWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #3 of 9 for CDWP-1 to CDWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00113
  system: Chilled Water Plant
  equipment_class: Condenser Water Pump
  equipment_instance: CDWP-1 to CDWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #4 of 9 for CDWP-1 to CDWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00114
  system: Chilled Water Plant
  equipment_class: Condenser Water Pump
  equipment_instance: CDWP-1 to CDWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #5 of 9 for CDWP-1 to CDWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00115
  system: Chilled Water Plant
  equipment_class: Condenser Water Pump
  equipment_instance: CDWP-1 to CDWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #6 of 9 for CDWP-1 to CDWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00116
  system: Chilled Water Plant
  equipment_class: Condenser Water Pump
  equipment_instance: CDWP-1 to CDWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #7 of 9 for CDWP-1 to CDWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00117
  system: Chilled Water Plant
  equipment_class: Condenser Water Pump
  equipment_instance: CDWP-1 to CDWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #8 of 9 for CDWP-1 to CDWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00118
  system: Chilled Water Plant
  equipment_class: Condenser Water Pump
  equipment_instance: CDWP-1 to CDWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DI
  point_description: 'DI point #9 of 9 for CDWP-1 to CDWP-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00119
  system: Chilled Water Plant
  equipment_class: Condenser Water Pump
  equipment_instance: CDWP-1 to CDWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DO
  point_description: 'DO point #1 of 3 for CDWP-1 to CDWP-3'
  field_device: Command relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Condenser water pumps; pump motor status, H/O/A, trip alarm; on/off control.
- id: P-00120
  system: Chilled Water Plant
  equipment_class: Condenser Water Pump
  equipment_instance: CDWP-1 to CDWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DO
  point_description: 'DO point #2 of 3 for CDWP-1 to CDWP-3'
  field_device: Command relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00121
  system: Chilled Water Plant
  equipment_class: Condenser Water Pump
  equipment_instance: CDWP-1 to CDWP-3
  location: 2F
  panel: BMS-PNL-CHWPLANT-2F
  type: DO
  point_description: 'DO point #3 of 3 for CDWP-1 to CDWP-3'
  field_device: Command relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00122
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #1 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: 'Per unit: 7 AI / 3 AO / 2 DI / 0 DO / 2 HLI = 14 pts. Per-AHU points: fan
    motor status, fan trip, VFD speed, fan ctrl on/off/mod, supply air temp, mixed
    air temp, supply humidity, 2-way CHW valve status & mod ctrl, OA + RA motorized
    damper status & ctrl, CO2 sensor at return duct.'
- id: P-00123
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #2 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00124
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #3 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00125
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #4 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00126
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #5 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00127
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #6 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00128
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #7 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00129
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #8 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00130
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #9 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00131
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #10 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00132
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #11 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00133
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #12 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00134
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #13 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00135
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #14 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00136
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #15 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00137
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #16 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00138
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #17 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00139
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #18 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00140
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #19 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00141
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #20 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00142
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #21 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00143
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #22 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00144
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #23 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00145
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #24 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00146
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #25 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00147
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #26 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00148
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #27 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00149
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #28 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00150
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #29 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00151
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #30 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00152
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #31 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00153
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #32 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00154
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #33 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00155
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #34 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00156
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #35 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00157
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #36 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00158
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #37 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00159
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #38 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00160
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #39 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00161
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #40 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00162
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #41 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00163
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #42 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00164
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #43 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00165
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #44 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00166
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #45 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00167
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #46 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00168
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #47 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00169
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #48 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00170
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #49 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00171
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #50 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00172
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #51 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00173
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #52 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00174
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #53 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00175
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #54 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00176
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #55 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00177
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #56 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00178
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #57 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00179
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #58 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00180
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #59 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00181
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #60 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00182
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #61 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00183
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #62 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00184
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #63 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00185
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #64 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00186
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #65 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00187
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #66 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00188
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #67 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00189
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #68 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00190
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #69 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00191
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AI
  point_description: 'AI point #70 of 70 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00192
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #1 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: 'Per unit: 7 AI / 3 AO / 2 DI / 0 DO / 2 HLI = 14 pts. Per-AHU points: fan
    motor status, fan trip, VFD speed, fan ctrl on/off/mod, supply air temp, mixed
    air temp, supply humidity, 2-way CHW valve status & mod ctrl, OA + RA motorized
    damper status & ctrl, CO2 sensor at return duct.'
- id: P-00193
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #2 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00194
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #3 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00195
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #4 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00196
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #5 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00197
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #6 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00198
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #7 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00199
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #8 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00200
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #9 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00201
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #10 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00202
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #11 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00203
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #12 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00204
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #13 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00205
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #14 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00206
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #15 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00207
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #16 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00208
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #17 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00209
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #18 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00210
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #19 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00211
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #20 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00212
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #21 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00213
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #22 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00214
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #23 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00215
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #24 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00216
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #25 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00217
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #26 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00218
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #27 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00219
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #28 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00220
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #29 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00221
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: AO
  point_description: 'AO point #30 of 30 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00222
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #1 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: 'Per unit: 7 AI / 3 AO / 2 DI / 0 DO / 2 HLI = 14 pts. Per-AHU points: fan
    motor status, fan trip, VFD speed, fan ctrl on/off/mod, supply air temp, mixed
    air temp, supply humidity, 2-way CHW valve status & mod ctrl, OA + RA motorized
    damper status & ctrl, CO2 sensor at return duct.'
- id: P-00223
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #2 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00224
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #3 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00225
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #4 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00226
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #5 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00227
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #6 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00228
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #7 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00229
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #8 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00230
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #9 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00231
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #10 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00232
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #11 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00233
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #12 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00234
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #13 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00235
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #14 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00236
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #15 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00237
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #16 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00238
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #17 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00239
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #18 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00240
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #19 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00241
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: DI
  point_description: 'DI point #20 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00242
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #1 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: 'Per unit: 7 AI / 3 AO / 2 DI / 0 DO / 2 HLI = 14 pts. Per-AHU points: fan
    motor status, fan trip, VFD speed, fan ctrl on/off/mod, supply air temp, mixed
    air temp, supply humidity, 2-way CHW valve status & mod ctrl, OA + RA motorized
    damper status & ctrl, CO2 sensor at return duct.'
- id: P-00243
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #2 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00244
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #3 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00245
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #4 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00246
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #5 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00247
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #6 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00248
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #7 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00249
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #8 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00250
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #9 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00251
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #10 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00252
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #11 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00253
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #12 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00254
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #13 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00255
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #14 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00256
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #15 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00257
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #16 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00258
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #17 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00259
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #18 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00260
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #19 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00261
  system: Air Handling — Basement / Podium BOH
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-2/B.2/B.3/PP/CL/FRE/FRD
  location: 2F
  panel: BMS-PNL-BOHAHU-2F
  type: HLI
  point_description: 'HLI point #20 of 20 for AHU-2/B.2/B.3/PP/CL/FRE/FRD'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00262
  system: Air Handling — Pre-cooled
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-0.1
  location: 2F
  panel: BMS-PNL-AHU-2F
  type: AI
  point_description: 'AI point #1 of 6 for PAHU-0.1'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Pre-cooled AHU at 2F. Mirrors BMS-04 PAHU P&ID block (AI 6 / AO 2 / DI 7
    / DO 0 / NETWORK 3). HLI/NETWORK 4 reflects BTU meter + VFD network points.
- id: P-00263
  system: Air Handling — Pre-cooled
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-0.1
  location: 2F
  panel: BMS-PNL-AHU-2F
  type: AI
  point_description: 'AI point #2 of 6 for PAHU-0.1'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00264
  system: Air Handling — Pre-cooled
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-0.1
  location: 2F
  panel: BMS-PNL-AHU-2F
  type: AI
  point_description: 'AI point #3 of 6 for PAHU-0.1'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00265
  system: Air Handling — Pre-cooled
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-0.1
  location: 2F
  panel: BMS-PNL-AHU-2F
  type: AI
  point_description: 'AI point #4 of 6 for PAHU-0.1'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00266
  system: Air Handling — Pre-cooled
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-0.1
  location: 2F
  panel: BMS-PNL-AHU-2F
  type: AI
  point_description: 'AI point #5 of 6 for PAHU-0.1'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00267
  system: Air Handling — Pre-cooled
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-0.1
  location: 2F
  panel: BMS-PNL-AHU-2F
  type: AI
  point_description: 'AI point #6 of 6 for PAHU-0.1'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00268
  system: Air Handling — Pre-cooled
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-0.1
  location: 2F
  panel: BMS-PNL-AHU-2F
  type: AO
  point_description: 'AO point #1 of 2 for PAHU-0.1'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Pre-cooled AHU at 2F. Mirrors BMS-04 PAHU P&ID block (AI 6 / AO 2 / DI 7
    / DO 0 / NETWORK 3). HLI/NETWORK 4 reflects BTU meter + VFD network points.
- id: P-00269
  system: Air Handling — Pre-cooled
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-0.1
  location: 2F
  panel: BMS-PNL-AHU-2F
  type: AO
  point_description: 'AO point #2 of 2 for PAHU-0.1'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00270
  system: Air Handling — Pre-cooled
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-0.1
  location: 2F
  panel: BMS-PNL-AHU-2F
  type: DI
  point_description: 'DI point #1 of 4 for PAHU-0.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Pre-cooled AHU at 2F. Mirrors BMS-04 PAHU P&ID block (AI 6 / AO 2 / DI 7
    / DO 0 / NETWORK 3). HLI/NETWORK 4 reflects BTU meter + VFD network points.
- id: P-00271
  system: Air Handling — Pre-cooled
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-0.1
  location: 2F
  panel: BMS-PNL-AHU-2F
  type: DI
  point_description: 'DI point #2 of 4 for PAHU-0.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00272
  system: Air Handling — Pre-cooled
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-0.1
  location: 2F
  panel: BMS-PNL-AHU-2F
  type: DI
  point_description: 'DI point #3 of 4 for PAHU-0.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00273
  system: Air Handling — Pre-cooled
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-0.1
  location: 2F
  panel: BMS-PNL-AHU-2F
  type: DI
  point_description: 'DI point #4 of 4 for PAHU-0.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00274
  system: Air Handling — Pre-cooled
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-0.1
  location: 2F
  panel: BMS-PNL-AHU-2F
  type: HLI
  point_description: 'HLI point #1 of 4 for PAHU-0.1'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Pre-cooled AHU at 2F. Mirrors BMS-04 PAHU P&ID block (AI 6 / AO 2 / DI 7
    / DO 0 / NETWORK 3). HLI/NETWORK 4 reflects BTU meter + VFD network points.
- id: P-00275
  system: Air Handling — Pre-cooled
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-0.1
  location: 2F
  panel: BMS-PNL-AHU-2F
  type: HLI
  point_description: 'HLI point #2 of 4 for PAHU-0.1'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00276
  system: Air Handling — Pre-cooled
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-0.1
  location: 2F
  panel: BMS-PNL-AHU-2F
  type: HLI
  point_description: 'HLI point #3 of 4 for PAHU-0.1'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00277
  system: Air Handling — Pre-cooled
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-0.1
  location: 2F
  panel: BMS-PNL-AHU-2F
  type: HLI
  point_description: 'HLI point #4 of 4 for PAHU-0.1'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00278
  system: Plumbing — Sanitary Hot Water
  equipment_class: Calorifier (Hot Water Storage Tank)
  equipment_instance: HWT-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: AI
  point_description: 'AI point #1 of 3 for HWT-LZ (×3)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Hot water storage tanks at Lower Ground; tank temperature only.
- id: P-00279
  system: Plumbing — Sanitary Hot Water
  equipment_class: Calorifier (Hot Water Storage Tank)
  equipment_instance: HWT-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: AI
  point_description: 'AI point #2 of 3 for HWT-LZ (×3)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00280
  system: Plumbing — Sanitary Hot Water
  equipment_class: Calorifier (Hot Water Storage Tank)
  equipment_instance: HWT-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: AI
  point_description: 'AI point #3 of 3 for HWT-LZ (×3)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00281
  system: Plumbing — Sanitary Hot Water
  equipment_class: Calorifier (Hot Water Storage Tank)
  equipment_instance: HWT-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: AI
  point_description: 'AI point #1 of 3 for HWT-HZ (×3)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Hot water storage tanks at Roofdeck.
- id: P-00282
  system: Plumbing — Sanitary Hot Water
  equipment_class: Calorifier (Hot Water Storage Tank)
  equipment_instance: HWT-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: AI
  point_description: 'AI point #2 of 3 for HWT-HZ (×3)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00283
  system: Plumbing — Sanitary Hot Water
  equipment_class: Calorifier (Hot Water Storage Tank)
  equipment_instance: HWT-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: AI
  point_description: 'AI point #3 of 3 for HWT-HZ (×3)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00284
  system: Plumbing — Sanitary Hot Water
  equipment_class: CHW Supply Main Header
  equipment_instance: HW Supply & Return Header (LG)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: AI
  point_description: 'AI point #1 of 6 for HW Supply & Return Header (LG)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: HW supply temp, HW return temp, MUW header temp (×2 each).
- id: P-00285
  system: Plumbing — Sanitary Hot Water
  equipment_class: CHW Supply Main Header
  equipment_instance: HW Supply & Return Header (LG)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: AI
  point_description: 'AI point #2 of 6 for HW Supply & Return Header (LG)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00286
  system: Plumbing — Sanitary Hot Water
  equipment_class: CHW Supply Main Header
  equipment_instance: HW Supply & Return Header (LG)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: AI
  point_description: 'AI point #3 of 6 for HW Supply & Return Header (LG)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00287
  system: Plumbing — Sanitary Hot Water
  equipment_class: CHW Supply Main Header
  equipment_instance: HW Supply & Return Header (LG)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: AI
  point_description: 'AI point #4 of 6 for HW Supply & Return Header (LG)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00288
  system: Plumbing — Sanitary Hot Water
  equipment_class: CHW Supply Main Header
  equipment_instance: HW Supply & Return Header (LG)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: AI
  point_description: 'AI point #5 of 6 for HW Supply & Return Header (LG)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00289
  system: Plumbing — Sanitary Hot Water
  equipment_class: CHW Supply Main Header
  equipment_instance: HW Supply & Return Header (LG)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: AI
  point_description: 'AI point #6 of 6 for HW Supply & Return Header (LG)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00290
  system: Plumbing — Sanitary Hot Water
  equipment_class: Heat Pump
  equipment_instance: HP-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: HLI
  point_description: 'HLI point #1 of 9 for HP-LZ (×3)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Heat pumps at Lower Ground; pump motor status + H/O/A + trip via HLI (Modbus/BACnet
    from packaged HP).
- id: P-00291
  system: Plumbing — Sanitary Hot Water
  equipment_class: Heat Pump
  equipment_instance: HP-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: HLI
  point_description: 'HLI point #2 of 9 for HP-LZ (×3)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00292
  system: Plumbing — Sanitary Hot Water
  equipment_class: Heat Pump
  equipment_instance: HP-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: HLI
  point_description: 'HLI point #3 of 9 for HP-LZ (×3)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00293
  system: Plumbing — Sanitary Hot Water
  equipment_class: Heat Pump
  equipment_instance: HP-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: HLI
  point_description: 'HLI point #4 of 9 for HP-LZ (×3)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00294
  system: Plumbing — Sanitary Hot Water
  equipment_class: Heat Pump
  equipment_instance: HP-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: HLI
  point_description: 'HLI point #5 of 9 for HP-LZ (×3)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00295
  system: Plumbing — Sanitary Hot Water
  equipment_class: Heat Pump
  equipment_instance: HP-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: HLI
  point_description: 'HLI point #6 of 9 for HP-LZ (×3)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00296
  system: Plumbing — Sanitary Hot Water
  equipment_class: Heat Pump
  equipment_instance: HP-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: HLI
  point_description: 'HLI point #7 of 9 for HP-LZ (×3)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00297
  system: Plumbing — Sanitary Hot Water
  equipment_class: Heat Pump
  equipment_instance: HP-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: HLI
  point_description: 'HLI point #8 of 9 for HP-LZ (×3)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00298
  system: Plumbing — Sanitary Hot Water
  equipment_class: Heat Pump
  equipment_instance: HP-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: HLI
  point_description: 'HLI point #9 of 9 for HP-LZ (×3)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00299
  system: Plumbing — Sanitary Hot Water
  equipment_class: Heat Pump
  equipment_instance: HP-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: HLI
  point_description: 'HLI point #1 of 9 for HP-HZ (×3)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Heat pumps at Roofdeck; HLI per packaged controller.
- id: P-00300
  system: Plumbing — Sanitary Hot Water
  equipment_class: Heat Pump
  equipment_instance: HP-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: HLI
  point_description: 'HLI point #2 of 9 for HP-HZ (×3)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00301
  system: Plumbing — Sanitary Hot Water
  equipment_class: Heat Pump
  equipment_instance: HP-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: HLI
  point_description: 'HLI point #3 of 9 for HP-HZ (×3)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00302
  system: Plumbing — Sanitary Hot Water
  equipment_class: Heat Pump
  equipment_instance: HP-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: HLI
  point_description: 'HLI point #4 of 9 for HP-HZ (×3)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00303
  system: Plumbing — Sanitary Hot Water
  equipment_class: Heat Pump
  equipment_instance: HP-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: HLI
  point_description: 'HLI point #5 of 9 for HP-HZ (×3)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00304
  system: Plumbing — Sanitary Hot Water
  equipment_class: Heat Pump
  equipment_instance: HP-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: HLI
  point_description: 'HLI point #6 of 9 for HP-HZ (×3)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00305
  system: Plumbing — Sanitary Hot Water
  equipment_class: Heat Pump
  equipment_instance: HP-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: HLI
  point_description: 'HLI point #7 of 9 for HP-HZ (×3)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00306
  system: Plumbing — Sanitary Hot Water
  equipment_class: Heat Pump
  equipment_instance: HP-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: HLI
  point_description: 'HLI point #8 of 9 for HP-HZ (×3)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00307
  system: Plumbing — Sanitary Hot Water
  equipment_class: Heat Pump
  equipment_instance: HP-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: HLI
  point_description: 'HLI point #9 of 9 for HP-HZ (×3)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00308
  system: Plumbing — Sanitary Hot Water
  equipment_class: Recirculating Pump
  equipment_instance: RP-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: DI
  point_description: 'DI point #1 of 9 for RP-LZ (×3)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Recirculating pumps at Lower Ground; pump motor status, H/O/A, trip.
- id: P-00309
  system: Plumbing — Sanitary Hot Water
  equipment_class: Recirculating Pump
  equipment_instance: RP-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: DI
  point_description: 'DI point #2 of 9 for RP-LZ (×3)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00310
  system: Plumbing — Sanitary Hot Water
  equipment_class: Recirculating Pump
  equipment_instance: RP-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: DI
  point_description: 'DI point #3 of 9 for RP-LZ (×3)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00311
  system: Plumbing — Sanitary Hot Water
  equipment_class: Recirculating Pump
  equipment_instance: RP-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: DI
  point_description: 'DI point #4 of 9 for RP-LZ (×3)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00312
  system: Plumbing — Sanitary Hot Water
  equipment_class: Recirculating Pump
  equipment_instance: RP-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: DI
  point_description: 'DI point #5 of 9 for RP-LZ (×3)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00313
  system: Plumbing — Sanitary Hot Water
  equipment_class: Recirculating Pump
  equipment_instance: RP-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: DI
  point_description: 'DI point #6 of 9 for RP-LZ (×3)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00314
  system: Plumbing — Sanitary Hot Water
  equipment_class: Recirculating Pump
  equipment_instance: RP-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: DI
  point_description: 'DI point #7 of 9 for RP-LZ (×3)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00315
  system: Plumbing — Sanitary Hot Water
  equipment_class: Recirculating Pump
  equipment_instance: RP-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: DI
  point_description: 'DI point #8 of 9 for RP-LZ (×3)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00316
  system: Plumbing — Sanitary Hot Water
  equipment_class: Recirculating Pump
  equipment_instance: RP-LZ (×3)
  location: LG
  panel: BMS-PNL-PLUMBING-LG
  type: DI
  point_description: 'DI point #9 of 9 for RP-LZ (×3)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00317
  system: Plumbing — Sanitary Hot Water
  equipment_class: Recirculating Pump
  equipment_instance: RP-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: DI
  point_description: 'DI point #1 of 9 for RP-HZ (×3)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Recirculating pumps at Roofdeck.
- id: P-00318
  system: Plumbing — Sanitary Hot Water
  equipment_class: Recirculating Pump
  equipment_instance: RP-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: DI
  point_description: 'DI point #2 of 9 for RP-HZ (×3)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00319
  system: Plumbing — Sanitary Hot Water
  equipment_class: Recirculating Pump
  equipment_instance: RP-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: DI
  point_description: 'DI point #3 of 9 for RP-HZ (×3)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00320
  system: Plumbing — Sanitary Hot Water
  equipment_class: Recirculating Pump
  equipment_instance: RP-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: DI
  point_description: 'DI point #4 of 9 for RP-HZ (×3)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00321
  system: Plumbing — Sanitary Hot Water
  equipment_class: Recirculating Pump
  equipment_instance: RP-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: DI
  point_description: 'DI point #5 of 9 for RP-HZ (×3)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00322
  system: Plumbing — Sanitary Hot Water
  equipment_class: Recirculating Pump
  equipment_instance: RP-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: DI
  point_description: 'DI point #6 of 9 for RP-HZ (×3)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00323
  system: Plumbing — Sanitary Hot Water
  equipment_class: Recirculating Pump
  equipment_instance: RP-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: DI
  point_description: 'DI point #7 of 9 for RP-HZ (×3)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00324
  system: Plumbing — Sanitary Hot Water
  equipment_class: Recirculating Pump
  equipment_instance: RP-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: DI
  point_description: 'DI point #8 of 9 for RP-HZ (×3)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00325
  system: Plumbing — Sanitary Hot Water
  equipment_class: Recirculating Pump
  equipment_instance: RP-HZ (×3)
  location: RD
  panel: BMS-PNL-PLUMBING-RD
  type: DI
  point_description: 'DI point #9 of 9 for RP-HZ (×3)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00326
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #1 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: GF Main Lobby exhaust fans; 3 DI per fan (start/stop, trip, H/O/A).
- id: P-00327
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #2 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00328
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #3 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00329
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #4 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00330
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #5 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00331
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #6 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00332
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #7 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00333
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #8 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00334
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #9 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00335
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #10 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00336
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #11 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00337
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #12 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00338
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #13 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00339
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #14 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00340
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #15 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00341
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #16 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00342
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #17 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00343
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #18 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00344
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #19 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00345
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #20 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00346
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #21 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00347
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #22 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00348
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #23 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00349
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #24 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00350
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #25 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00351
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #26 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00352
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1
  location: GF
  panel: BMS-PNL-VENT-GF
  type: DI
  point_description: 'DI point #27 of 27 for TEF-1.1 to 1.4 + EF-1.2A/LPG.1/1MR.1/1STO.1/MRF.1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00353
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #1 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: 2nd Floor exhaust fans; 3 DI per fan.
- id: P-00354
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #2 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00355
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #3 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00356
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #4 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00357
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #5 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00358
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #6 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00359
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #7 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00360
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #8 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00361
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #9 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00362
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #10 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00363
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #11 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00364
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #12 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00365
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #13 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00366
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #14 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00367
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #15 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00368
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #16 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00369
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #17 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00370
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #18 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00371
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #19 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00372
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #20 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00373
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #21 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00374
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #22 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00375
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #23 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00376
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #24 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00377
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #25 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00378
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #26 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00379
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #27 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00380
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #28 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00381
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #29 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00382
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #30 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00383
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #31 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00384
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #32 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00385
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #33 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00386
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #34 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00387
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #35 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00388
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #36 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00389
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #37 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00390
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #38 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00391
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2 + EF-2.1 to 2.4 +
    EF-CHRx2
  location: 2F
  panel: BMS-PNL-VENT-2F
  type: DI
  point_description: 'DI point #39 of 39 for TEF-2.1/2.3/2B.3 + EF-2B.1/2B.2/GS.1&GS.2
    + EF-2.1 to 2.4 + EF-CHRx2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00392
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #1 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: 3rd Amenity Area + Guestroom exhaust fans. Includes 20 toilet exhausts for
    guestroom floor type 3D plus toilet exhausts for floor types 3A/3B/3C. 3 DI per
    fan.
- id: P-00393
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #2 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00394
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #3 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00395
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #4 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00396
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #5 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00397
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #6 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00398
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #7 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00399
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #8 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00400
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #9 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00401
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #10 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00402
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #11 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00403
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #12 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00404
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #13 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00405
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #14 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00406
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #15 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00407
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #16 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00408
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #17 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00409
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #18 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00410
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #19 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00411
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #20 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00412
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #21 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00413
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #22 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00414
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #23 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00415
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #24 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00416
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #25 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00417
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #26 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00418
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #27 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00419
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #28 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00420
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #29 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00421
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #30 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00422
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #31 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00423
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #32 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00424
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #33 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00425
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #34 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00426
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #35 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00427
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #36 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00428
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #37 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00429
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #38 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00430
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #39 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00431
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #40 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00432
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #41 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00433
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #42 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00434
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #43 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00435
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #44 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00436
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #45 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00437
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #46 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00438
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #47 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00439
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #48 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00440
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #49 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00441
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #50 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00442
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #51 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00443
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #52 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00444
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #53 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00445
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #54 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00446
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #55 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00447
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #56 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00448
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #57 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00449
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #58 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00450
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #59 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00451
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #60 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00452
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #61 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00453
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #62 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00454
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #63 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00455
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #64 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00456
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #65 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00457
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #66 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00458
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #67 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00459
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #68 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00460
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #69 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00461
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #70 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00462
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #71 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00463
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #72 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00464
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #73 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00465
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #74 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00466
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #75 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00467
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #76 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00468
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #77 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00469
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #78 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00470
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #79 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00471
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #80 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00472
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: TEF-3Ax2/3B/3Cx2/3Dx20 + others
  location: 3F
  panel: BMS-PNL-VENT-3F
  type: DI
  point_description: 'DI point #81 of 81 for TEF-3Ax2/3B/3Cx2/3Dx20 + others'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00473
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: EF-RD.1/RD.2, EF-1
  location: RD
  panel: BMS-PNL-VENT-RD
  type: DI
  point_description: 'DI point #1 of 9 for EF-RD.1/RD.2, EF-1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Roofdeck exhaust fans; 3 DI per fan.
- id: P-00474
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: EF-RD.1/RD.2, EF-1
  location: RD
  panel: BMS-PNL-VENT-RD
  type: DI
  point_description: 'DI point #2 of 9 for EF-RD.1/RD.2, EF-1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00475
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: EF-RD.1/RD.2, EF-1
  location: RD
  panel: BMS-PNL-VENT-RD
  type: DI
  point_description: 'DI point #3 of 9 for EF-RD.1/RD.2, EF-1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00476
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: EF-RD.1/RD.2, EF-1
  location: RD
  panel: BMS-PNL-VENT-RD
  type: DI
  point_description: 'DI point #4 of 9 for EF-RD.1/RD.2, EF-1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00477
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: EF-RD.1/RD.2, EF-1
  location: RD
  panel: BMS-PNL-VENT-RD
  type: DI
  point_description: 'DI point #5 of 9 for EF-RD.1/RD.2, EF-1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00478
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: EF-RD.1/RD.2, EF-1
  location: RD
  panel: BMS-PNL-VENT-RD
  type: DI
  point_description: 'DI point #6 of 9 for EF-RD.1/RD.2, EF-1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00479
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: EF-RD.1/RD.2, EF-1
  location: RD
  panel: BMS-PNL-VENT-RD
  type: DI
  point_description: 'DI point #7 of 9 for EF-RD.1/RD.2, EF-1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00480
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: EF-RD.1/RD.2, EF-1
  location: RD
  panel: BMS-PNL-VENT-RD
  type: DI
  point_description: 'DI point #8 of 9 for EF-RD.1/RD.2, EF-1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00481
  system: General Ventilation
  equipment_class: Exhaust Fan (General)
  equipment_instance: EF-RD.1/RD.2, EF-1
  location: RD
  panel: BMS-PNL-VENT-RD
  type: DI
  point_description: 'DI point #9 of 9 for EF-RD.1/RD.2, EF-1'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00482
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: AI
  point_description: 'AI point #1 of 6 for SB-1 & SB-2'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Steam boilers at Lower Ground. Supply steam temp, low/high water level, burner
    power, small/big fire control signal, motorized stop valve, burner status, burner
    fire running status, fuel-oil pump status, motorized blowdown valve, feedwater
    supply temp, flue gas O2 level, oxygen level. Approximate split — exact AI/DI
    breakdown obscured at tile resolution.
- id: P-00483
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: AI
  point_description: 'AI point #2 of 6 for SB-1 & SB-2'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00484
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: AI
  point_description: 'AI point #3 of 6 for SB-1 & SB-2'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00485
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: AI
  point_description: 'AI point #4 of 6 for SB-1 & SB-2'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00486
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: AI
  point_description: 'AI point #5 of 6 for SB-1 & SB-2'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00487
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: AI
  point_description: 'AI point #6 of 6 for SB-1 & SB-2'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00488
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: DI
  point_description: 'DI point #1 of 14 for SB-1 & SB-2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Steam boilers at Lower Ground. Supply steam temp, low/high water level, burner
    power, small/big fire control signal, motorized stop valve, burner status, burner
    fire running status, fuel-oil pump status, motorized blowdown valve, feedwater
    supply temp, flue gas O2 level, oxygen level. Approximate split — exact AI/DI
    breakdown obscured at tile resolution.
- id: P-00489
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: DI
  point_description: 'DI point #2 of 14 for SB-1 & SB-2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00490
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: DI
  point_description: 'DI point #3 of 14 for SB-1 & SB-2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00491
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: DI
  point_description: 'DI point #4 of 14 for SB-1 & SB-2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00492
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: DI
  point_description: 'DI point #5 of 14 for SB-1 & SB-2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00493
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: DI
  point_description: 'DI point #6 of 14 for SB-1 & SB-2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00494
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: DI
  point_description: 'DI point #7 of 14 for SB-1 & SB-2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00495
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: DI
  point_description: 'DI point #8 of 14 for SB-1 & SB-2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00496
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: DI
  point_description: 'DI point #9 of 14 for SB-1 & SB-2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00497
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: DI
  point_description: 'DI point #10 of 14 for SB-1 & SB-2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00498
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: DI
  point_description: 'DI point #11 of 14 for SB-1 & SB-2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00499
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: DI
  point_description: 'DI point #12 of 14 for SB-1 & SB-2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00500
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: DI
  point_description: 'DI point #13 of 14 for SB-1 & SB-2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00501
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: DI
  point_description: 'DI point #14 of 14 for SB-1 & SB-2'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00502
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: DO
  point_description: 'DO point #1 of 2 for SB-1 & SB-2'
  field_device: Command relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Steam boilers at Lower Ground. Supply steam temp, low/high water level, burner
    power, small/big fire control signal, motorized stop valve, burner status, burner
    fire running status, fuel-oil pump status, motorized blowdown valve, feedwater
    supply temp, flue gas O2 level, oxygen level. Approximate split — exact AI/DI
    breakdown obscured at tile resolution.
- id: P-00503
  system: Boiler / Laundry
  equipment_class: Steam Boiler
  equipment_instance: SB-1 & SB-2
  location: LG
  panel: BMS-PNL-BOILER-LG
  type: DO
  point_description: 'DO point #2 of 2 for SB-1 & SB-2'
  field_device: Command relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00504
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AI
  point_description: 'AI point #1 of 16 for DOAS (Casino) — 2 units'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: 'Dedicated outdoor-air system serving casino. Per-unit: fresh-air fan status
    / trip / on-off-auto, VFD speed & ctrl, OA temp + humidity (ambient), indoor mixed-air
    temp + humidity, supply temp + humidity, OA + RA motorized damper status & ctrl,
    2-way CHW valve status, CHW mod valve ctrl, exhaust fan motor status / trip /
    on-off-auto, recovery wheel status / trip. Casino-specific.'
- id: P-00505
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AI
  point_description: 'AI point #2 of 16 for DOAS (Casino) — 2 units'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00506
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AI
  point_description: 'AI point #3 of 16 for DOAS (Casino) — 2 units'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00507
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AI
  point_description: 'AI point #4 of 16 for DOAS (Casino) — 2 units'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00508
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AI
  point_description: 'AI point #5 of 16 for DOAS (Casino) — 2 units'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00509
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AI
  point_description: 'AI point #6 of 16 for DOAS (Casino) — 2 units'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00510
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AI
  point_description: 'AI point #7 of 16 for DOAS (Casino) — 2 units'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00511
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AI
  point_description: 'AI point #8 of 16 for DOAS (Casino) — 2 units'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00512
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AI
  point_description: 'AI point #9 of 16 for DOAS (Casino) — 2 units'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00513
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AI
  point_description: 'AI point #10 of 16 for DOAS (Casino) — 2 units'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00514
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AI
  point_description: 'AI point #11 of 16 for DOAS (Casino) — 2 units'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00515
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AI
  point_description: 'AI point #12 of 16 for DOAS (Casino) — 2 units'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00516
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AI
  point_description: 'AI point #13 of 16 for DOAS (Casino) — 2 units'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00517
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AI
  point_description: 'AI point #14 of 16 for DOAS (Casino) — 2 units'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00518
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AI
  point_description: 'AI point #15 of 16 for DOAS (Casino) — 2 units'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00519
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AI
  point_description: 'AI point #16 of 16 for DOAS (Casino) — 2 units'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00520
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AO
  point_description: 'AO point #1 of 6 for DOAS (Casino) — 2 units'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: 'Dedicated outdoor-air system serving casino. Per-unit: fresh-air fan status
    / trip / on-off-auto, VFD speed & ctrl, OA temp + humidity (ambient), indoor mixed-air
    temp + humidity, supply temp + humidity, OA + RA motorized damper status & ctrl,
    2-way CHW valve status, CHW mod valve ctrl, exhaust fan motor status / trip /
    on-off-auto, recovery wheel status / trip. Casino-specific.'
- id: P-00521
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AO
  point_description: 'AO point #2 of 6 for DOAS (Casino) — 2 units'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00522
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AO
  point_description: 'AO point #3 of 6 for DOAS (Casino) — 2 units'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00523
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AO
  point_description: 'AO point #4 of 6 for DOAS (Casino) — 2 units'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00524
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AO
  point_description: 'AO point #5 of 6 for DOAS (Casino) — 2 units'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00525
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: AO
  point_description: 'AO point #6 of 6 for DOAS (Casino) — 2 units'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00526
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: DI
  point_description: 'DI point #1 of 4 for DOAS (Casino) — 2 units'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: 'Dedicated outdoor-air system serving casino. Per-unit: fresh-air fan status
    / trip / on-off-auto, VFD speed & ctrl, OA temp + humidity (ambient), indoor mixed-air
    temp + humidity, supply temp + humidity, OA + RA motorized damper status & ctrl,
    2-way CHW valve status, CHW mod valve ctrl, exhaust fan motor status / trip /
    on-off-auto, recovery wheel status / trip. Casino-specific.'
- id: P-00527
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: DI
  point_description: 'DI point #2 of 4 for DOAS (Casino) — 2 units'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00528
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: DI
  point_description: 'DI point #3 of 4 for DOAS (Casino) — 2 units'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00529
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: DI
  point_description: 'DI point #4 of 4 for DOAS (Casino) — 2 units'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00530
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: HLI
  point_description: 'HLI point #1 of 4 for DOAS (Casino) — 2 units'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: 'Dedicated outdoor-air system serving casino. Per-unit: fresh-air fan status
    / trip / on-off-auto, VFD speed & ctrl, OA temp + humidity (ambient), indoor mixed-air
    temp + humidity, supply temp + humidity, OA + RA motorized damper status & ctrl,
    2-way CHW valve status, CHW mod valve ctrl, exhaust fan motor status / trip /
    on-off-auto, recovery wheel status / trip. Casino-specific.'
- id: P-00531
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: HLI
  point_description: 'HLI point #2 of 4 for DOAS (Casino) — 2 units'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00532
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: HLI
  point_description: 'HLI point #3 of 4 for DOAS (Casino) — 2 units'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00533
  system: Casino MVAC — Dedicated Outdoor Air
  equipment_class: DOAS Unit
  equipment_instance: DOAS (Casino) — 2 units
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: HLI
  point_description: 'HLI point #4 of 4 for DOAS (Casino) — 2 units'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00534
  system: Casino MVAC — Smoke Sanitizer
  equipment_class: Ozone Generator (UV-light or Corona)
  equipment_instance: Sanitizer for AHU-2M.1/2M.2
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: DI
  point_description: 'DI point #1 of 4 for Sanitizer for AHU-2M.1/2M.2'
  field_device: Auxiliary contact / status relay
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Casino-specific air sanitizer / ionizer + VOC monitoring. Equipment status,
    trip status, VOC monitoring.
- id: P-00535
  system: Casino MVAC — Smoke Sanitizer
  equipment_class: Ozone Generator (UV-light or Corona)
  equipment_instance: Sanitizer for AHU-2M.1/2M.2
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: DI
  point_description: 'DI point #2 of 4 for Sanitizer for AHU-2M.1/2M.2'
  field_device: Auxiliary contact / status relay
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00536
  system: Casino MVAC — Smoke Sanitizer
  equipment_class: Ozone Generator (UV-light or Corona)
  equipment_instance: Sanitizer for AHU-2M.1/2M.2
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: DI
  point_description: 'DI point #3 of 4 for Sanitizer for AHU-2M.1/2M.2'
  field_device: Auxiliary contact / status relay
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00537
  system: Casino MVAC — Smoke Sanitizer
  equipment_class: Ozone Generator (UV-light or Corona)
  equipment_instance: Sanitizer for AHU-2M.1/2M.2
  location: 2F
  panel: BMS-PNL-CASINO-2F
  type: DI
  point_description: 'DI point #4 of 4 for Sanitizer for AHU-2M.1/2M.2'
  field_device: Auxiliary contact / status relay
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00538
  system: Air Handling — Pre-cooled (Roofdeck)
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-RD (×2)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #1 of 4 for PAHU-RD (×2)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Pre-cooled AHU serving guestroom DOAS. Fresh-air fan motor status / trip
    / on-off-auto, static pressure transmitter, VFD HLI, start/stop ctrl.
- id: P-00539
  system: Air Handling — Pre-cooled (Roofdeck)
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-RD (×2)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #2 of 4 for PAHU-RD (×2)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00540
  system: Air Handling — Pre-cooled (Roofdeck)
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-RD (×2)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #3 of 4 for PAHU-RD (×2)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00541
  system: Air Handling — Pre-cooled (Roofdeck)
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-RD (×2)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #4 of 4 for PAHU-RD (×2)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00542
  system: Air Handling — Pre-cooled (Roofdeck)
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-RD (×2)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DI
  point_description: 'DI point #1 of 6 for PAHU-RD (×2)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Pre-cooled AHU serving guestroom DOAS. Fresh-air fan motor status / trip
    / on-off-auto, static pressure transmitter, VFD HLI, start/stop ctrl.
- id: P-00543
  system: Air Handling — Pre-cooled (Roofdeck)
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-RD (×2)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DI
  point_description: 'DI point #2 of 6 for PAHU-RD (×2)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00544
  system: Air Handling — Pre-cooled (Roofdeck)
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-RD (×2)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DI
  point_description: 'DI point #3 of 6 for PAHU-RD (×2)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00545
  system: Air Handling — Pre-cooled (Roofdeck)
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-RD (×2)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DI
  point_description: 'DI point #4 of 6 for PAHU-RD (×2)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00546
  system: Air Handling — Pre-cooled (Roofdeck)
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-RD (×2)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DI
  point_description: 'DI point #5 of 6 for PAHU-RD (×2)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00547
  system: Air Handling — Pre-cooled (Roofdeck)
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-RD (×2)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DI
  point_description: 'DI point #6 of 6 for PAHU-RD (×2)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00548
  system: Air Handling — Pre-cooled (Roofdeck)
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-RD (×2)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DO
  point_description: 'DO point #1 of 2 for PAHU-RD (×2)'
  field_device: Command relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Pre-cooled AHU serving guestroom DOAS. Fresh-air fan motor status / trip
    / on-off-auto, static pressure transmitter, VFD HLI, start/stop ctrl.
- id: P-00549
  system: Air Handling — Pre-cooled (Roofdeck)
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-RD (×2)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DO
  point_description: 'DO point #2 of 2 for PAHU-RD (×2)'
  field_device: Command relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00550
  system: Air Handling — Pre-cooled (Roofdeck)
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-RD (×2)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: HLI
  point_description: 'HLI point #1 of 2 for PAHU-RD (×2)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Pre-cooled AHU serving guestroom DOAS. Fresh-air fan motor status / trip
    / on-off-auto, static pressure transmitter, VFD HLI, start/stop ctrl.
- id: P-00551
  system: Air Handling — Pre-cooled (Roofdeck)
  equipment_class: Precooled Air Handling Unit
  equipment_instance: PAHU-RD (×2)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: HLI
  point_description: 'HLI point #2 of 2 for PAHU-RD (×2)'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00552
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #1 of 16 for AHU-RD (with CHW mod valve)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Supply/mixed/ambient air temp + humidity, OA motorized damper status & ctrl,
    2-way CHW valve status & mod ctrl. Drawn alongside hotel guestroom AHU points.
- id: P-00553
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #2 of 16 for AHU-RD (with CHW mod valve)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00554
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #3 of 16 for AHU-RD (with CHW mod valve)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00555
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #4 of 16 for AHU-RD (with CHW mod valve)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00556
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #5 of 16 for AHU-RD (with CHW mod valve)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00557
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #6 of 16 for AHU-RD (with CHW mod valve)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00558
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #7 of 16 for AHU-RD (with CHW mod valve)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00559
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #8 of 16 for AHU-RD (with CHW mod valve)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00560
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #9 of 16 for AHU-RD (with CHW mod valve)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00561
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #10 of 16 for AHU-RD (with CHW mod valve)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00562
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #11 of 16 for AHU-RD (with CHW mod valve)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00563
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #12 of 16 for AHU-RD (with CHW mod valve)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00564
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #13 of 16 for AHU-RD (with CHW mod valve)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00565
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #14 of 16 for AHU-RD (with CHW mod valve)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00566
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #15 of 16 for AHU-RD (with CHW mod valve)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00567
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AI
  point_description: 'AI point #16 of 16 for AHU-RD (with CHW mod valve)'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00568
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AO
  point_description: 'AO point #1 of 4 for AHU-RD (with CHW mod valve)'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Supply/mixed/ambient air temp + humidity, OA motorized damper status & ctrl,
    2-way CHW valve status & mod ctrl. Drawn alongside hotel guestroom AHU points.
- id: P-00569
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AO
  point_description: 'AO point #2 of 4 for AHU-RD (with CHW mod valve)'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00570
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AO
  point_description: 'AO point #3 of 4 for AHU-RD (with CHW mod valve)'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00571
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: AO
  point_description: 'AO point #4 of 4 for AHU-RD (with CHW mod valve)'
  field_device: Modulating actuator / VFD set-point
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00572
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DI
  point_description: 'DI point #1 of 8 for AHU-RD (with CHW mod valve)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Supply/mixed/ambient air temp + humidity, OA motorized damper status & ctrl,
    2-way CHW valve status & mod ctrl. Drawn alongside hotel guestroom AHU points.
- id: P-00573
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DI
  point_description: 'DI point #2 of 8 for AHU-RD (with CHW mod valve)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00574
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DI
  point_description: 'DI point #3 of 8 for AHU-RD (with CHW mod valve)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00575
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DI
  point_description: 'DI point #4 of 8 for AHU-RD (with CHW mod valve)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00576
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DI
  point_description: 'DI point #5 of 8 for AHU-RD (with CHW mod valve)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00577
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DI
  point_description: 'DI point #6 of 8 for AHU-RD (with CHW mod valve)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00578
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DI
  point_description: 'DI point #7 of 8 for AHU-RD (with CHW mod valve)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00579
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DI
  point_description: 'DI point #8 of 8 for AHU-RD (with CHW mod valve)'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00580
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DO
  point_description: 'DO point #1 of 4 for AHU-RD (with CHW mod valve)'
  field_device: Command relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Supply/mixed/ambient air temp + humidity, OA motorized damper status & ctrl,
    2-way CHW valve status & mod ctrl. Drawn alongside hotel guestroom AHU points.
- id: P-00581
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DO
  point_description: 'DO point #2 of 4 for AHU-RD (with CHW mod valve)'
  field_device: Command relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00582
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DO
  point_description: 'DO point #3 of 4 for AHU-RD (with CHW mod valve)'
  field_device: Command relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00583
  system: Air Handling — Roofdeck AHU
  equipment_class: AHU (Chilled-Water-Served)
  equipment_instance: AHU-RD (with CHW mod valve)
  location: RD
  panel: BMS-PNL-AHU-RD
  type: DO
  point_description: 'DO point #4 of 4 for AHU-RD (with CHW mod valve)'
  field_device: Command relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00584
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #1 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Cooling towers at Roofdeck. Fan motor status / trip, low-level alarm, high-level
    alarm, ambient temp + humidity, water temp monitoring (cond ret), CW makeup return
    + supply, motorized isolation valve, blowdown corrosion / scale monitoring, motorized
    blowdown control valve.
- id: P-00585
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #2 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00586
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #3 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00587
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #4 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00588
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #5 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00589
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #6 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00590
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #7 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00591
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #8 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00592
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #9 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00593
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #10 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00594
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #11 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00595
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #12 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00596
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #13 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00597
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #14 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00598
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #15 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00599
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #16 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00600
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #17 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00601
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #18 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00602
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #19 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00603
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #20 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00604
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #21 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00605
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #22 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00606
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #23 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00607
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: AI
  point_description: 'AI point #24 of 24 for CT-1 to CT-3'
  field_device: Sensor (T/RH/P/flow per point)
  c_o: BMS Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00608
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: DI
  point_description: 'DI point #1 of 8 for CT-1 to CT-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Cooling towers at Roofdeck. Fan motor status / trip, low-level alarm, high-level
    alarm, ambient temp + humidity, water temp monitoring (cond ret), CW makeup return
    + supply, motorized isolation valve, blowdown corrosion / scale monitoring, motorized
    blowdown control valve.
- id: P-00609
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: DI
  point_description: 'DI point #2 of 8 for CT-1 to CT-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00610
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: DI
  point_description: 'DI point #3 of 8 for CT-1 to CT-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00611
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: DI
  point_description: 'DI point #4 of 8 for CT-1 to CT-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00612
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: DI
  point_description: 'DI point #5 of 8 for CT-1 to CT-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00613
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: DI
  point_description: 'DI point #6 of 8 for CT-1 to CT-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00614
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: DI
  point_description: 'DI point #7 of 8 for CT-1 to CT-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00615
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: DI
  point_description: 'DI point #8 of 8 for CT-1 to CT-3'
  field_device: Auxiliary contact / status relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00616
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: DO
  point_description: 'DO point #1 of 3 for CT-1 to CT-3'
  field_device: Command relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Cooling towers at Roofdeck. Fan motor status / trip, low-level alarm, high-level
    alarm, ambient temp + humidity, water temp monitoring (cond ret), CW makeup return
    + supply, motorized isolation valve, blowdown corrosion / scale monitoring, motorized
    blowdown control valve.
- id: P-00617
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: DO
  point_description: 'DO point #2 of 3 for CT-1 to CT-3'
  field_device: Command relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00618
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: DO
  point_description: 'DO point #3 of 3 for CT-1 to CT-3'
  field_device: Command relay
  c_o: ME Contractor
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: ''
- id: P-00619
  system: Heat Rejection — Cooling Tower
  equipment_class: Cooling Tower
  equipment_instance: CT-1 to CT-3
  location: RD
  panel: BMS-PNL-CT-RD
  type: HLI
  point_description: 'HLI point #1 of 1 for CT-1 to CT-3'
  field_device: BACnet/Modbus gateway driver
  c_o: Equipment Supplier
  description_of_operations_ref: Per MC Standards ME/PL points list + project-specific
    BMS-01/02 (TUEC)
  source: BMS-01/02 (TUEC) Construction Bulletin Oct-2025
  notes: Cooling towers at Roofdeck. Fan motor status / trip, low-level alarm, high-level
    alarm, ambient temp + humidity, water temp monitoring (cond ret), CW makeup return
    + supply, motorized isolation valve, blowdown corrosion / scale monitoring, motorized
    blowdown control valve.
summary:
  total_points: 619
  by_type:
    AI: 187
    AO: 43
    DI: 323
    DO: 17
    HLI: 49
  panels:
  - BMS-PNL-AHU-2F
  - BMS-PNL-AHU-RD
  - BMS-PNL-BOHAHU-2F
  - BMS-PNL-BOILER-LG
  - BMS-PNL-CASINO-2F
  - BMS-PNL-CHWPLANT-2F
  - BMS-PNL-CT-RD
  - BMS-PNL-PLUMBING-LG
  - BMS-PNL-PLUMBING-RD
  - BMS-PNL-VENT-2F
  - BMS-PNL-VENT-3F
  - BMS-PNL-VENT-GF
  - BMS-PNL-VENT-RD
  equipment_instances: 23
