# A4 — Panel Schedule
# Generated from A1-io-list.yaml
#
metadata:
  project: "Kingsford Hotel Bacolod \u2014 BMS"
  generated_from: A1-io-list.yaml
  generator: _playbook/tools/generate-a4-panel-schedule.py
  controller_sizing_rule: 1 DDC controller per 40 physical I/O, +1 network gateway if Network drops present. Refine after Q-008 confirms wiring topology.
  power_estimate_basis: ~25W per controller, ~5W per network device. Excludes UPS/transformer overhead.
summary:
  total_panels: 8
  total_physical_io: 622
  total_hli_subpoints: 102
  total_network_drops: 29
  total_io_points: 753
  total_controllers_estimated: 19
  total_power_watts_estimated: 620
  panel_summary_table:
  - panel: BMS-PNL-2F-CASINO
    location: 2nd Floor BOH / 2nd Floor Casino / 2nd Floor Casino MVAC Room
    physical_io: 84
    network: 3
    controllers: 3
    power_w: 90
    equipment_count: 11
  - panel: BMS-PNL-3F
    location: 3rd Floor Amenity
    physical_io: 75
    network: 1
    controllers: 2
    power_w: 55
    equipment_count: 26
  - panel: BMS-PNL-B1
    location: Basement 1 / Basement 1 BOH
    physical_io: 63
    network: 0
    controllers: 2
    power_w: 50
    equipment_count: 17
  - panel: BMS-PNL-GF
    location: Ground Floor / Ground Floor BOH / Ground Floor Lobby / Ground Floor Mezzanine BOH / Main Switchgear Room
    physical_io: 63
    network: 3
    controllers: 2
    power_w: 65
    equipment_count: 16
  - panel: BMS-PNL-LG-CHILLER
    location: 2nd Level Mechanical Room
    physical_io: 72
    network: 11
    controllers: 2
    power_w: 105
    equipment_count: 20
  - panel: BMS-PNL-LG-PLUMB
    location: Lower Ground HW Plant / Lower Ground Laundry
    physical_io: 40
    network: 1
    controllers: 2
    power_w: 55
    equipment_count: 13
  - panel: BMS-PNL-RD-CT
    location: Roof Deck Mechanical
    physical_io: 40
    network: 0
    controllers: 1
    power_w: 25
    equipment_count: 4
  - panel: BMS-PNL-RD-MECH
    location: Roof Deck / Roof Deck HW Plant / Roof Deck Mechanical
    physical_io: 185
    network: 10
    controllers: 5
    power_w: 175
    equipment_count: 25
panels:
- id: BMS-PNL-2F-CASINO
  location: 2nd Floor BOH / 2nd Floor Casino / 2nd Floor Casino MVAC Room
  system_scope:
  - casino_mvac
  - common_area
  - power_metering
  - ventilation
  equipment_served:
    instance_count: 11
    instances:
    - AHU-2F-1
    - AHU-2M.1
    - AHU-2M.2
    - DOAS-2F-CASINO
    - ION-2F-1
    - ION-2F-2
    - PM-CASINO-FB
    - PM-KITCHEN-2F
    - TEF-2.1
    - TEF-2.3
    - TEF-2B.3
    by_class:
      AHU (Modulating CHW-served): 34
      DOAS Unit: 26
      AHU (Chilled-Water-Served): 16
      Exhaust Fan (Toilet): 9
      Ozone Generator (UV-light or Corona): 4
      Multifunction Power Meter (Feeder): 2
  io_summary:
    physical_io: 84
    hli_subpoints: 4
    network_drops: 3
    total: 91
    by_type:
      AI: 30
      AO: 16
      DI: 38
      HLI: 4
      Network: 3
    by_co:
      BMS Contractor: 37
      Equipment Supplier: 43
      ME Contractor: 11
  controller_estimate:
    ddc_controllers: 3
    network_gateway: 1
    total_controllers: 3
    rule: 1 DDC per 40 physical I/O, plus 1 network gateway if BACnet/Modbus integration on panel
  power_estimate_w: 90
  enclosure_assumption: Wall-mount IP54 metal cabinet, sized per controller count + 30% spare
  notes: ''
- id: BMS-PNL-3F
  location: 3rd Floor Amenity
  system_scope:
  - power_metering
  - ventilation
  equipment_served:
    instance_count: 26
    instances:
    - PM-LIGHTING-GUEST
    - TEF-3A.1
    - TEF-3A.2
    - TEF-3B
    - TEF-3C.1
    - TEF-3C.2
    - TEF-3D.1
    - TEF-3D.10
    - TEF-3D.11
    - TEF-3D.12
    - TEF-3D.13
    - TEF-3D.14
    - TEF-3D.15
    - TEF-3D.16
    - TEF-3D.17
    - TEF-3D.18
    - TEF-3D.19
    - TEF-3D.2
    - TEF-3D.20
    - TEF-3D.3
    - TEF-3D.4
    - TEF-3D.5
    - TEF-3D.6
    - TEF-3D.7
    - TEF-3D.8
    - TEF-3D.9
    by_class:
      Exhaust Fan (Toilet): 75
      Multifunction Power Meter (Feeder): 1
  io_summary:
    physical_io: 75
    hli_subpoints: 0
    network_drops: 1
    total: 76
    by_type:
      DI: 75
      Network: 1
    by_co:
      BMS Contractor: 1
      Equipment Supplier: 75
  controller_estimate:
    ddc_controllers: 2
    network_gateway: 1
    total_controllers: 2
    rule: 1 DDC per 40 physical I/O, plus 1 network gateway if BACnet/Modbus integration on panel
  power_estimate_w: 55
  enclosure_assumption: Wall-mount IP54 metal cabinet, sized per controller count + 30% spare
  notes: ''
- id: BMS-PNL-B1
  location: Basement 1 / Basement 1 BOH
  system_scope:
  - common_area
  - ventilation
  equipment_served:
    instance_count: 17
    instances:
    - AHU-B1-1
    - TEF-B.1
    - TEF-B.10
    - TEF-B.11
    - TEF-B.12
    - TEF-B.13
    - TEF-B.14
    - TEF-B.15
    - TEF-B.16
    - TEF-B.2
    - TEF-B.3
    - TEF-B.4
    - TEF-B.5
    - TEF-B.6
    - TEF-B.7
    - TEF-B.8
    - TEF-B.9
    by_class:
      Exhaust Fan (Toilet): 48
      AHU (Chilled-Water-Served): 16
  io_summary:
    physical_io: 63
    hli_subpoints: 1
    network_drops: 0
    total: 64
    by_type:
      AI: 6
      AO: 4
      DI: 53
      HLI: 1
    by_co:
      BMS Contractor: 7
      Equipment Supplier: 54
      ME Contractor: 3
  controller_estimate:
    ddc_controllers: 2
    network_gateway: 0
    total_controllers: 2
    rule: 1 DDC per 40 physical I/O, plus 1 network gateway if BACnet/Modbus integration on panel
  power_estimate_w: 50
  enclosure_assumption: Wall-mount IP54 metal cabinet, sized per controller count + 30% spare
  notes: ''
- id: BMS-PNL-GF
  location: Ground Floor / Ground Floor BOH / Ground Floor Lobby / Ground Floor Mezzanine BOH / Main Switchgear Room
  system_scope:
  - common_area
  - power_metering
  - ventilation
  equipment_served:
    instance_count: 16
    instances:
    - AHU-GF-1
    - AHU-GFM-1
    - EF-1.2A
    - EF-1MR.1
    - EF-1STO.1
    - EF-LPG.1
    - EF-MRF.1
    - PM-ELEVATOR
    - PM-LOBBY-GF
    - PM-MAIN
    - TEF-1.1
    - TEF-1.2
    - TEF-1.3
    - TEF-1.4
    - TEF-GS.1
    - TEF-GS.2
    by_class:
      AHU (Chilled-Water-Served): 32
      Exhaust Fan (Toilet): 18
      Exhaust Fan (General): 15
      Multifunction Power Meter (Feeder): 2
      Multifunction Power Meter (Main): 1
  io_summary:
    physical_io: 63
    hli_subpoints: 2
    network_drops: 3
    total: 68
    by_type:
      AI: 12
      AO: 8
      DI: 43
      HLI: 2
      Network: 3
    by_co:
      BMS Contractor: 17
      Equipment Supplier: 45
      ME Contractor: 6
  controller_estimate:
    ddc_controllers: 2
    network_gateway: 1
    total_controllers: 2
    rule: 1 DDC per 40 physical I/O, plus 1 network gateway if BACnet/Modbus integration on panel
  power_estimate_w: 65
  enclosure_assumption: Wall-mount IP54 metal cabinet, sized per controller count + 30% spare
  notes: ''
- id: BMS-PNL-LG-CHILLER
  location: 2nd Level Mechanical Room
  system_scope:
  - btu_metering
  - chilled_water
  - power_metering
  equipment_served:
    instance_count: 20
    instances:
    - BTU-1
    - BTU-2
    - BTU-3
    - BTU-4
    - BTU-5
    - CH-1
    - CH-2
    - CH-3
    - CHW-BYPASS
    - CHW-HDR-R
    - CHW-HDR-S
    - CWP-1
    - CWP-2
    - CWP-3
    - PCHWP-1
    - PCHWP-2
    - PCHWP-3
    - PM-CHILLER-1
    - PM-CHILLER-2
    - PM-CHILLER-3
    by_class:
      Chiller (Package Water-Cooled): 84
      Primary CHW Pump: 24
      Condenser Water Pump: 18
      CHW Bypass Header: 5
      BTU Meter: 5
      Multifunction Power Meter (Feeder): 3
      CHW Supply Main Header: 2
      CHW Return Main Header: 2
  io_summary:
    physical_io: 72
    hli_subpoints: 60
    network_drops: 11
    total: 143
    by_type:
      AI: 28
      AO: 4
      DI: 31
      DO: 9
      HLI: 60
      Network: 11
    by_co:
      BMS Contractor: 40
      Equipment Supplier: 90
      ME Contractor: 13
  controller_estimate:
    ddc_controllers: 2
    network_gateway: 1
    total_controllers: 2
    rule: 1 DDC per 40 physical I/O, plus 1 network gateway if BACnet/Modbus integration on panel
  power_estimate_w: 105
  enclosure_assumption: Wall-mount IP54 metal cabinet, sized per controller count + 30% spare
  notes: ''
- id: BMS-PNL-LG-PLUMB
  location: Lower Ground HW Plant / Lower Ground Laundry
  system_scope:
  - hot_water
  - power_metering
  - steam
  equipment_served:
    instance_count: 13
    instances:
    - HP-LZ-1
    - HP-LZ-2
    - HP-LZ-3
    - HW-HEADERS
    - HWT-LZ-1
    - HWT-LZ-2
    - HWT-LZ-3
    - PM-LAUNDRY-LG
    - RP-LZ-1
    - RP-LZ-2
    - RP-LZ-3
    - SB-1
    - SB-2
    by_class:
      Steam Boiler: 42
      Heat Pump: 9
      Recirculating Pump: 9
      Calorifier (Hot Water Storage Tank): 3
      Hot Water Header Set: 3
      Multifunction Power Meter (Feeder): 1
  io_summary:
    physical_io: 40
    hli_subpoints: 26
    network_drops: 1
    total: 67
    by_type:
      AI: 16
      AO: 4
      DI: 20
      HLI: 26
      Network: 1
    by_co:
      BMS Contractor: 23
      Equipment Supplier: 44
  controller_estimate:
    ddc_controllers: 1
    network_gateway: 1
    total_controllers: 2
    rule: 1 DDC per 40 physical I/O, plus 1 network gateway if BACnet/Modbus integration on panel
  power_estimate_w: 55
  enclosure_assumption: Wall-mount IP54 metal cabinet, sized per controller count + 30% spare
  notes: ''
- id: BMS-PNL-RD-CT
  location: Roof Deck Mechanical
  system_scope:
  - condenser_water
  equipment_served:
    instance_count: 4
    instances:
    - CT-1
    - CT-2
    - CT-3
    - CT-COMMON
    by_class:
      Cooling Tower: 36
      Cooling Tower (Common): 4
  io_summary:
    physical_io: 40
    hli_subpoints: 0
    network_drops: 0
    total: 40
    by_type:
      AI: 13
      AO: 3
      DI: 18
      DO: 6
    by_co:
      BMS Contractor: 23
      Equipment Supplier: 9
      ME Contractor: 8
  controller_estimate:
    ddc_controllers: 1
    network_gateway: 0
    total_controllers: 1
    rule: 1 DDC per 40 physical I/O, plus 1 network gateway if BACnet/Modbus integration on panel
  power_estimate_w: 25
  enclosure_assumption: Wall-mount IP54 metal cabinet, sized per controller count + 30% spare
  notes: ''
- id: BMS-PNL-RD-MECH
  location: Roof Deck / Roof Deck HW Plant / Roof Deck Mechanical
  system_scope:
  - hot_water
  - power_metering
  - ventilation
  equipment_served:
    instance_count: 25
    instances:
    - DOAS-RD1
    - DOAS-RD2
    - EF-1
    - EF-RD.1
    - EF-RD.2
    - HP-HZ-1
    - HP-HZ-2
    - HP-HZ-3
    - HWT-HZ-1
    - HWT-HZ-2
    - HWT-HZ-3
    - PAHU-01
    - PAHU-02
    - PAHU-03
    - PAHU-04
    - PAHU-05
    - PAHU-06
    - PAHU-07
    - PM-ROOFDECK-MECH
    - RP-HZ-1
    - RP-HZ-2
    - RP-HZ-3
    - TEF-RD.1
    - TEF-RD.2
    - TEF-RD.3
    by_class:
      Precooled Air Handling Unit: 112
      DOAS Unit: 52
      Exhaust Fan (Toilet): 9
      Exhaust Fan (General): 9
      Heat Pump: 9
      Recirculating Pump: 9
      Calorifier (Hot Water Storage Tank): 3
      Multifunction Power Meter (Feeder): 1
  io_summary:
    physical_io: 185
    hli_subpoints: 9
    network_drops: 10
    total: 204
    by_type:
      AI: 65
      AO: 29
      DI: 91
      HLI: 9
      Network: 10
    by_co:
      BMS Contractor: 84
      Equipment Supplier: 102
      ME Contractor: 18
  controller_estimate:
    ddc_controllers: 5
    network_gateway: 1
    total_controllers: 5
    rule: 1 DDC per 40 physical I/O, plus 1 network gateway if BACnet/Modbus integration on panel
  power_estimate_w: 175
  enclosure_assumption: Wall-mount IP54 metal cabinet, sized per controller count + 30% spare
  notes: ''