# Instance: BMS Field Devices — Plumbing — Kingsford Hotel Bacolod

**WBS leaves served:** 2.5, 3.5.2
**Module ref:** `_playbook/modules/bms/field-devices-plumbing.md`

## Project-specific parameters

Plumbing scope = Centralized Hot Water only (A-011, pending Q-002):
- 6× Calorifiers (3 LZ + 3 HZ)
- 6× Heat Pumps (DI from Equipment Supplier aux contacts)
- 6× Recirc Pumps (same)
- 1× HW Header set (LG)
- 2× Steam Boilers (HLI integration + BMS-supplied steam pressure / fluegas O2 / feedwater temp / blowdown valve)

## BOQ line items
Per BOQ aggregations under 2.5 / 3.5.2.

## Cross-references
A1 PL rows; A-011; Q-002.
