# Instance: BMS Field Devices — HVAC — Kingsford Hotel Bacolod

**WBS leaves served:** 2.4, 3.5.1
**Module ref:** `_playbook/modules/bms/field-devices-hvac.md`

## Project-specific parameters

HVAC equipment scope (per A2):
- 3× Chiller (HLI integration only); 3× Primary CHW Pump; 3× CW Pump; 3× Cooling Tower + 1× CT-Common
- 3× CHW Headers (S/R/Bypass)
- 3× DOAS (2 Roofdeck + 1 Casino 2F)
- 7× PAHU (Roofdeck)
- 4× BOH AHU + 2× Casino AHU (with CO sensors per A-009)
- 2× Casino ionizers
- 68× Exhaust fans (toilet/general — DI status only)
- 2× Steam boilers (HLI)
- 5× BTU meters (Modbus)

## BOQ line items
Per BOQ aggregations under 2.4 / 3.5.1.

## Cross-references
A1, A2; A-009, A-022; Q-003 (guestroom controls), Q-008 (CO sensors).