# A7 — Power Provisions Schedule
metadata:
  project: Kingsford Hotel Bacolod — BMS
  date: 2026-04-28
  source: A4 panel schedule + BMS general spec (per Q-004 EE-Contractor coordination)
  status: draft

field_panels:
  total_panel_load_w: 600
  per_panel:
    - panel: PNL-CHPLANT-GND
      load_w: 90
    - panel: PNL-RD
      load_w: 75
    - panel: PNL-3F
      load_w: 80
    - panel: PNL-2F
      load_w: 80
    - panel: PNL-GF
      load_w: 90
    - panel: PNL-BSMT
      load_w: 60
    - panel: PNL-BOH-2F
      load_w: 50
    - panel: PNL-HE-GF
      load_w: 75

head_end:
  total_head_end_load_w: 2150
  components:
    - id: HE-SVR-01-02
      load_w: 850
    - id: HE-WS-01
      load_w: 250
    - id: HE-GFX-01
      load_w: 350
    - id: HE-UPS-01-bypass-loss
      load_w: 100
    - id: HE-NETWORK
      load_w: 600

network_edge:
  total_edge_load_w: 250
  components:
    - id: SW-CORE
      load_w: 75
    - id: SW-edge-x6
      load_w: 175

summary:
  total_bms_load_w: 3000
  notes: "EE Contractor provides 8 dedicated 240V single-phase 16A circuits to BMS field panels + 1 dedicated 32A circuit to head-end UPS input. Head-end UPS-protected; field panels utility-fed (UPS optional, not in base scope)."