# Per-tier drawing references for A3 cable-length estimation.
# Provisional, hand-authored 2026-04-30 — the agent did not capture exact drawing
# pages during its visual-tier estimation pass for MRT7. Future projects will
# populate this automatically once the playbook patch (Task 07 — scaled cable
# routes) lands.
#
# Each tier_id matches an entry in A3-route-lengths.yaml.
# For each tier, list the drawing(s) the visual estimation referenced. The
# review UI deep-links into these (file + page) so reviewers can eyeball the
# distances against the same source the agent used.

metadata:
  authored_by: "review-team / hand-mapped"
  status: "provisional"
  basis: "Best mapping from ANNEX_A pdftotext sheet titles. Verify against actual sheets."

tier_drawings:
  ADMIN-INTERNAL:
    - file: "00-customer-inputs/ANNEX_A-Depot-Electronics-Network.pdf"
      page: 6
      label: "Admin Building close-up — internal layout"
    - file: "00-customer-inputs/ANNEX_A-Depot-Electronics-Network.pdf"
      page: 9
      label: "Admin Building electronics layout"

  ADMIN-ADJACENT:
    - file: "00-customer-inputs/ANNEX_A-Depot-Electronics-Network.pdf"
      page: 1
      label: "Site Development Plan — overall"
    - file: "00-customer-inputs/ANNEX_A-Depot-Electronics-Network.pdf"
      page: 10
      label: "Overall Site Development — Fire Detection"

  ADMIN-MIDZONE:
    - file: "00-customer-inputs/ANNEX_A-Depot-Electronics-Network.pdf"
      page: 10
      label: "Overall Site Development — Fire Detection"
    - file: "00-customer-inputs/ANNEX_A-Depot-Electronics-Network.pdf"
      page: 15
      label: "Overall Site Development — Security"

  ADMIN-PERIMETER:
    - file: "00-customer-inputs/ANNEX_A-Depot-Electronics-Network.pdf"
      page: 1
      label: "Site Development Plan — full footprint"
    - file: "00-customer-inputs/ANNEX_A-Depot-Electronics-Network.pdf"
      page: 19
      label: "Overall Site Development — Equipment Plan"

  BUILDING-STUB-UP:
    - file: "00-customer-inputs/ANNEX_A-Depot-Electronics-Network.pdf"
      page: 10
      label: "Reference: typical building entry pattern"

  STATION-INTRA:
    # Methodology-based, not drawing-derived. Listed for transparency: stations
    # are out-of-scope for this annex; agent's value comes from "co-located
    # gateway + FACP" pattern, not a measured route.
    - file: "00-customer-inputs/ANNEX_C2-Electronics-Spec-Stations.pdf"
      page: 1
      label: "Station electronics spec (methodology reference)"
